CSI-Hardin
#90of 196 in Biomass#40of 115 in United States#65of 109 in Puro.earth (PUR)
Audit Analysis
CSI-Hardin is a very early-stage Puro.earth biomass storage project (PDD July 2024, first verification October 2024) with a 5-month monitoring window. While DNV verified the project with no material findings or corrective actions, critical integrity elements—buffer pool, leakage treatment, and safeguards documentation—are entirely absent from the extracted record, leaving meaningful gaps for a project type with inherent reversal and diversion risk.
Red Flags
- No buffer pool or permanence risk mitigation identified for a biomass storage project with inherent reversal risk (fire, pest, harvest)
- Leakage deduction and justification are entirely absent from both the PDD and verification report
- No safeguards documentation found: FPIC, grievance mechanism, and safeguards mentions are all unrecorded
- Internal contradiction in the verification report: both 102.75 and 3,248.69 tCO₂e appear as verified ERR figures in the same document
Credit Vintages Exhausted
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2024 | 3,248 | 3,248 | 0 | |
| Total | 3,248 | 3,248 | 0 |
Risk Indicators
Combined test conducted; VVB confirmation not explicitly sta
No buffer pool or reversal mitigation documented for biomass
No leakage deduction or justification found in any document
Project-specific baseline; reassessment date not stated
No FPIC, grievance mechanism, or safeguards documentation fo
CORSIA and CCP status both not stated; dual-channel risk una
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →