La Veta
#217of 352 in Biomass#254of 345 in United States#80of 111 in Puro.earth (PUR)
Audit Analysis
La Veta is a biomass storage project in the United States registered on Puro.earth with a VVB-confirmed combined additionality test and no reported reversal events. However, the verification report identified five material findings—including non-compliant sampling procedures, missing scope-3 vehicle emissions, and unsupported project-specific parameters—each requiring corrective action. The project delivered roughly 494% of the pro-rata ex-ante expectation for the elapsed monitoring period, a large over-delivery that warrants scrutiny, and key MRV parameters (FNRB, usage monitoring method, buffer pool) are absent from the available record.
Red Flags
- Five material findings in the verification report, including sampling procedures that do not satisfy the methodology's statistical requirements (Section 2.1, Rules 4.1.4, 6.4.3, 6.4.4)
- Verified ERR of 850.18 tCO₂e is approximately 494% of the pro-rata ex-ante expectation (~172 tCO₂e) for the 8.5-month monitoring period, indicating a large over-delivery relative to the lifetime estimate of 1,205.67 tCO₂e
- No buffer pool percentage stated in the available record despite inherent reversal risk from biomass decay and fire
- Project-specific parameters (35% Ox, 1% FCH4) lack supporting evidence and require ongoing justification in future reporting periods
- Only one document (the verification report) is available; no PDD, separate monitoring report, or baseline documentation was found
Credit Vintages Exhausted
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2026 | 850 | 850 | 0 | |
| Total | 850 | 850 | 0 |
Risk Indicators
Combined test, VVB-confirmed
decay/fire monitored
0% deemed negligible, no detailed justification
Project-specific, no reassessment date
Mentioned; FPIC and grievance not stated
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →