Vai al contenuto principale
PUR removal United Kingdom Documentazione completa General Methodology v2.0

Carbon Hill

PUR-712033 ↗

5.6 / 10
Integrity
6.2
Transparency
5.4
Claim Safety
5.0
Documentation
5.6

Score Breakdown

Integrity

verified The verification report (2025) confirms additionality using an investment test and reports no material findings.

missing Leakage treatment, baseline reassessment timing, and permanence risk controls (e.g., buffer/reversal provisions) were not found in the extracted record.

Transparency

verified The VVB is identified (EnergyLink Services) and the monitoring period is clearly stated (2023-09-01 to 2025-02-28) in the verification report (2025).

missing Claimed vs verified removal totals were not found in the extracted record, reducing MRV transparency.

Claim Safety

verified Additionality is VVB-confirmed in the verification report (2025), reducing (but not eliminating) non-additional credit risk.

missing CORSIA/CCP status and key quantification safeguards (leakage, permanence provisions, verified totals) were not found in the extracted record, elevating greenwashing/over-crediting risk.

Documentation

verified A recent verification report is available (dated 2025-12-16) and multiple documents were used (6).

missing Evidence document labeling is weak (“unknown”), extraction confidence is only medium, and at least one corrective action was required (biochar density).

Detailed Analysis

Integrity

The verification report (2025) confirms additionality via an investment test and reports no material findings, which supports integrity. However, the baseline is described only as project-specific in the extracted record, and the timing of any baseline reassessment was not found, increasing uncertainty. Leakage deduction and justification were not found in the extracted record, and permanence risk management details (buffer contribution and any reversal provisions) were also not found, which are important for biochar removal quality. A corrective action on “Biochar Density” in the verification report (2025) suggests a quantification control weakness affecting credited removals.

Transparency

The verification report (2025) provides clear basic metadata, including the VVB name (EnergyLink Services), methodology (Puro.earth Biochar Methodology v3.1), and the monitoring period (2023-09-01 to 2025-02-28). However, the extracted record does not include total removals claimed or total removals verified, preventing a transparent check of issuance quantities against monitoring results. Key MRV elements such as biochar usage monitoring method and any fossil/non-fossil biomass fraction approach were not found in the extracted record.

Claim Safety

Because total claimed and verified removals were not found in the extracted record, the risk of over-crediting cannot be meaningfully evaluated from the available data. CORSIA eligibility and CCP status were not found in the extracted record, so buyers cannot easily infer how the credits may be marketed across integrity labels. The presence of a corrective action related to biochar density in the verification report (2025) increases the risk that credited quantities could be sensitive to measurement assumptions unless clearly resolved and re-verified.

Documentation

Documentation is moderately strong in recency, with a verification report dated 2025-12-16 and an indicated set of 6 documents used. Still, the evidence document list is not specific (listed as “unknown”), which reduces auditability for third parties. Extraction confidence is medium, and the verification report (2025) required a corrective action on biochar density, both of which reduce confidence that all key quantitative fields were captured cleanly in the extracted record.

Overall

No contradictions were listed in the extracted record, so there were no cross-document discrepancies to resolve. Overall quality is constrained mainly by missing quantitative MRV outputs (claimed and verified removals), missing leakage treatment, and missing permanence risk controls (buffer/reversal provisions), despite a recent verification and VVB-confirmed additionality. If documentation were to score below 3.0, transparency would be capped by the gate rule; and if integrity were below 4.0, overall would be capped at 6.0—neither cap is triggered by the scores assigned here.

Audit Analysis

The project shows moderate integrity signals for a biochar removal activity, with additionality confirmed by the VVB and no material findings reported in the verification report (2025). However, key quantitative elements that affect credit quality—verified removals, leakage treatment, and permanence risk management (e.g., buffer or reversal provisions)—were not found in the extracted record, increasing uncertainty and over-crediting risk.

Project Description

PUR-712033 — Biomass Removal

Red Flags

  • Verified removals and claimed removals were not found in the extracted record, limiting the ability to assess over-crediting risk.
  • Leakage deduction and leakage justification were not found in the extracted record for a biomass/biochar pathway where upstream and transport leakage can be relevant.
  • Permanence risk management details (buffer contribution and any reversal provisions) were not found in the extracted record.
  • A corrective action on “Biochar Density” was required in the verification report (2025), indicating a data-quality issue in a key quantification parameter.

Credit Vintages Exhausted

Issued Retired Available
2022
185 185 0
2023
203 203 0
2024
281 281 0
2025
361 361 0
Total 1,030 1,030 0

Cosa migliorerebbe questo punteggio

  • Publish or extract the verified and claimed removal totals for the monitoring period, including the calculation workbook and key parameters (biochar mass, carbon content, stability factors, and uncertainty treatment).
  • Provide explicit leakage assessment (sources, quantification, and any deduction) and permanence risk management details (e.g., buffer contribution, reversal monitoring and remedy procedures) consistent with the Puro.earth biochar methodology.

Questi suggerimenti indicano quali prove pubbliche aggiuntive potrebbero migliorare il livello di confidenza di questa valutazione. Non garantiscono un punteggio futuro più alto.

Risk Indicators

Additionality

VVB-confirmed investment test

Permanence

Buffer/reversal provisions not evidenced

Leakage

Leakage treatment not evidenced

Baseline

Project-specific baseline; reassessment not evidenced

Safeguards

Safeguards mentioned; FPIC/grievance not evidenced

Double-claim

CORSIA/CCP status not evidenced

Where to buy

Marketplaces

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis Provenance Scored 2026-04-02 General Methodology v2.0 Documentazione completa

Sei il proprietario di questo progetto?

Correzione metadati (gratuita)

Nome, paese, marketplace o link errati? Segnalacelo.

Non modifica lo score.

[email protected]

Rivalutazione con nuovi documenti

Hai documentazione aggiornata non ancora inclusa? Puoi richiedere un nuovo run della pipeline con i nuovi input.

Invia Documenti