AMS-II.A — Supply side energy efficiency improvements – transmission and distribution

About this methodology

Projects upgrade electricity or heat distribution systems to reduce energy losses. The method measures the emission reductions associated with the electricity or fuel saved.

Version
10.0 · source ·
Status
Active at CDM / UNFCCC · source ·
Climate outcome
Emission reductions
Activity
Energy distribution
Official page
cdm.unfccc.int ·

How methodology v3 reads projects of this type

What CarbonMeld reads

  • shown

    Grid emission factor: the methodology sets rules for it. CarbonMeld reads it in the project's documents. CM-F-AMS-II-A-GRID-EF

    Link
  • shown

    Leakage: the methodology sets rules for it in some cases (AMS-II.A v10 para 10, p. 3). CarbonMeld reads it in the project's documents. CM-F-AMS-II-A-LEAKAGE

    Link
  • A confirmed investment analysis A-INVEST

    The documents show a project-level additionality test, the validation confirmed it, and it is an investment analysis (a numeric test of the project's finances with and without carbon revenue).

Set by the methodology or the programme, not assessed by our current method

  • not assessed

    Social safeguards and consent of communities (FPIC): any such rules come from the programme, not the methodology. Our current method does not assess it. CM-F-AMS-II-A-SAFEGUARDS-FPIC

    Link

Not applicable to this type — never a gap in our current method

The criterion does not apply to this methodology. Our current method never counts it as a gap.

The general rules apply as well. Read the general rules.

The rules of methodology v2.2, as they were: the archived v2.2 page.

History and transitions

All 9 versions
  • v10adopted 17 Jul 2009source

    To include an option to use the guidelines adopted by a national government agency to estimate/measure the energy loss in rural electricity distribution network.

  • v09adopted 27 Jul 2007source

    Allow for its application under a programme of activities (PoA)

  • v08adopted 23 Dec 2006source

    The threshold of small-scale Type II methodologies was increased from 15 GWh to 60 GWh. The consideration of transmission and distribution losses in the baseline estimation was removed.

  • v07adopted 25 Nov 2005source

    References to “non-renewable biomass” in Appendix B deleted.

  • v06adopted 20 Sept 2005source

    Guidance on consideration of non-renewable biomass in Type I methodologies, thermal equivalence of Type II GWhe limits included.

  • v05adopted 25 Feb 2005source

    Guidance on ‘capacity addition’ and ‘cofiring’ in Type I methodologies and monitoring of methane in AMS-III.D included.

  • v04adopted 22 Oct 2004source

    AMS-II.F was adopted; leakage due to equipment transfer was included in all Type I and Type II methodologies. 03 EB 14, Annex 2 New methodology AMS-III.E was adopted. UNFCCC/CCNUCC CDM – Executive Board II.A./Version 10 Sectoral Scope: 02 …

  • v02adopted 28 Nov 2003source

    Definition of build margin included in AMS-I.D, minor revisions to AMS-I.A, AMS-III.D, AMS-II.E.

  • v01adopted 21 Jan 2003source

    Initial adoption. The Board at its seventh meeting noted the adoption by the Conference of the Parties (COP), by its decision 21/CP.8, of simplified modalities and procedures for small-scale CDM project activities (SSC M&P).

Projects using AMS-II.A

Browse 7 published projects using AMS-II.A, listed alphabetically. There is no ranking for this methodology yet: it appears here automatically once 5 of its projects not in the pipeline or under validation are rated. Open a project to view its registry details and the analysis available for that project.

Which registries list projects under AMS-II.A?

In CarbonMeld's data, AMS-II.A projects are on one registry: CDM (7 projects, 5 registered).

RegistryProjectsRegisteredProjects list
CDM (UNFCCC)75See the list

Counts of project records in CarbonMeld's data, with or without a CarbonMeld analysis. «Registered» counts the records whose current registry status is «registered», as last read (15 November 2026); projects in a later status, such as awaiting verification approval, late to verify or completed, are not in that column.

3 of these projects have no number: additionality, quantification or both have no public grade of their type of project that applies to them yet. Their pages show the analysis.