Skip to main content
Rankings · methodology

Top AMS-II.B projects

6 rated projects in this methodology · average score 4.9/10 · ranked by CarbonMeld's document-based assessment scores across all four dimensions: integrity, transparency, claim safety and documentation.

← All leaderboards · Full database

#1DEWA Chiller Station LCDMUnited Arab EmiratesOtherRegistry: Registered5.8/10#2Energy efficiency improvement in Shenzhen Mawan power Co., Ltd.CDMChinaIndustrialRegistry: Registered5.2/10▲+0.6#3"Supply side energy efficiency improvements in steam generation at CSL." by Chemplast Sanmar LtdCDMIndiaIndustrialRegistry: Registered4.8/10
  1. 44.8
  2. 5
    Improvement in Energy Consumption of a HotelCDMIndiaOtherRegistry: Registered
    4.7
  3. 64.1

Rank is by document-based assessment score only. The registry status shown next to each project is a separate fact: inclusion in this ranking is not a statement of current validity or credit eligibility — projects suspended, withdrawn or terminated by their registry can still appear, with their status labelled. Read the methodology.