DEWA Chiller Station L
#4of 9 in United Arab Emirates#317of 1459 in CDM (UNFCCC)
Audit Analysis
DEWA Chiller Station L is a CDM energy-efficiency project with VVB-confirmed additionality (barrier test) and a measured project-specific baseline, verified by TÜV NORD CERT. The project shows no reversal events and a quantified 0% leakage deduction, but the ERR figures differ between the PDD (268,000 tCO₂e) and the monitoring report (331,545 tCO₂e), and several key parameters (fnrb, usage rates, baseline reassessment timing) are not stated in the available documents. Overall a moderately well-documented project with some data gaps and one notable quantitative discrepancy.
Red Flags
- ERR discrepancy: the PDD (2016) estimates 268,000 tCO₂e while the monitoring report (2023) reports 331,545 tCO₂e for the 2015–2020 period; the pro-rata expectation for 6 of 10 crediting years is ~160,800 tCO₂e, meaning the reported figure is roughly 206% of the pro-rata baseline estimate, which warrants scrutiny of the baseline or calculation methodology.
- Leakage justification is inconsistent across documents: the validation report (2012) characterises leakage as 'deemed negligible' while the monitoring report (2023) states it was 'quantified', yet both arrive at a 0% deduction without a clearly documented quantification method.
- No fnrb method or value, no usage-rate assumption or verification, and no baseline reassessment date are found in the extracted record, leaving key MRV parameters unverified.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2016 | 95,197 | 0 | 95,197 | |
| Total | 95,197 | 0 | 95,197 |
Risk Indicators
VVB-confirmed barrier test
EE service – no biogenic storage risk
0% deduction, justification inconsistent across docs
Project-specific measured; reassessment timing not stated
Safeguards mentioned; FPIC and grievance mechanism not detai
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →