Not registered
Energy Efficiency Improvement by installation of 3 MW Cogeneration Captive Power Plant by Andhra Organics Limited, Andhra Pradesh
- Standard
- CDM
- Methodology
- AMS-II.B (CDM)
- Registry
- CDM-VD57J6PKGQF ↗ · Terminated
- Country
- India
- Credit type
- EE supply side
The registry lists Energy Efficiency Improvement by installation of 3 MW Cogeneration Captive Power Plant by Andhra Organics Limited, Andhra Pradesh (CDM-VD57J6PKGQF) as “Validation Terminated”, and this page gives no CarbonMeld rating.
Assessment
No documents to analyse yet
No CarbonMeld rating yet: the registry has not published documents for this project, so there is nothing to analyse. Registry data and credit vintages below are live from the registry. The project enters the analysis automatically as soon as its documents appear.
Standard and methodology
Evidence
Eligibility & market
What can you claim with this credit?
Four checks buyers ask about, from the registry and the Integrity Council (ICVCM).
Airlines (CORSIA)
Not published
This registry does not publish CORSIA eligibility per project.
Integrity label (ICVCM CCP)
No ICVCM information
No CCP label and no ICVCM decision found for this project's methodology.
Removal or reduction
Emission reduction or avoidance
Prevents or reduces emissions — fits contribution claims, not SBTi neutralisation.
Source: methodology
Covers: the project type, not a label on individual credits
Paris Agreement (Article 6)
Not published
This registry does not publish Article 6 authorizations.
Information only, from public sources. Claim rules (CORSIA, SBTi, EU rules on green claims) change: check them before making a public claim. Since 27 September 2026, EU consumer rules do not allow “climate neutral” product claims based on offsets.
Credit Vintages
No issuances recorded on the registry.
Where to buy
Got an offer for these credits? Check it against the registry →
+ Know where to buy this?
Listing multiple projects? Send us a CSV at listings@carbonmeld.com.
Profile & governance
Are you the project owner?
Full analysis (free for owners)
Owners get free access to the full analysis of their own project: every rule that raised or lowered the number, with the fact and the source it rests on, the negative facts' detail and the documents read. Write to us from your organisation's email address.
hello@carbonmeld.com →Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the rating.
hello@carbonmeld.com →Report an error on this page
Something wrong in the analysis, or a registry document we have not used? Send us the link to the public source: you get a reference and an answer within 30 days.
Report an error on this page →Cite this page
CarbonMeld (2026). Energy Efficiency Improvement by installation of 3 MW Cogeneration Captive Power Plant by Andhra Organics Limited, Andhra Pradesh (CDM-VD57J6PKGQF): registry data. https://carbonmeld.com/projects/energy-efficiency-improvement-by-installation-of-3-mw-cogeneration-captive-power/.
The citation names the registry data this page shows; the page gives no CarbonMeld rating.
Similar projects
Same methodology or sector, the same registry first.
- Energy efficiency improvement in Shenzhen Mawan power Co., Ltd.CDM-8941
- Supply side energy efficiency measures at Tata Chemicals Limited, MithapurCDM-1013
- Medium Pressure Steam Condensate water recoveryCDM-10060
- Thermal Efficiency Improvement Initiatives in Coal Fired Boiler SystemCDM-0266
- A retrofit programme for decentralised heating stations in Mongolia.CDM-0295
- DEWA Chiller Station LCDM-7260
- "Supply side energy efficiency improvements in steam generation at CSL." by Chemplast Sanmar LtdCDM-0706
- Energy Efficiency Measures At a Thermal Power Generating Station Of CESC-limited, BBGSCDM-0479