Grid emission factor: the methodology sets rules for it. CarbonMeld reads it in the project's documents. CM-F-AMS-III-BB-GRID-EF
AMS-III.BB — Electrification of communities through grid extension or construction of new mini-grids
About this methodology
Projects electrify communities by extending a grid or building a mini-grid. The method compares electricity-supply emissions with the fossil-fuel lighting and generation displaced by the new service.
- Issued by
- CDM (UNFCCC) · issuer's site
- Version
- 3.0 · source ·
- Status
- Active at CDM / UNFCCC · source ·
- Climate outcome
- Emission reductions
- Activity
- Electricity
- Official page
- cdm.unfccc.int ·
- Also used by projects of
- Verra (VCS) (1 project)
How methodology v3 reads projects of this type
What CarbonMeld reads
- shown
A confirmed investment analysis A-INVEST
The documents show a project-level additionality test, the validation confirmed it, and it is an investment analysis (a numeric test of the project's finances with and without carbon revenue).
Deductions that can apply
No additionality test in the documents (renewable energy) A-TEST-NOT-STATED
Renewable energy, power generation and supply: the documents read state no additionality test. A test that the documents do not name is a different case. It takes no points. CarbonMeld applies this rule only where a check of the documents has confirmed its condition; without that check, the rule takes no points.
Set by the methodology or the programme, not assessed by our current method
- not assessed
Leakage: the methodology sets rules for it (AMS-III.BB v03.0 Leakage, p. 10). Our current method does not assess it. CM-F-AMS-III-BB-LEAKAGE
- not assessed
Usage rate of the devices: the methodology sets rules for it. Our current method does not assess it. CM-F-AMS-III-BB-USAGE
- not assessed
Social safeguards and consent of communities (FPIC): any such rules come from the programme, not the methodology. Our current method does not assess it. CM-F-AMS-III-BB-SAFEGUARDS-FPIC
Not applicable to this type — never a gap in our current method
The criterion does not apply to this methodology. Our current method never counts it as a gap.
- CM-N-BUFFERBuffer pool
- CM-N-PERMANENCE-REVERSALPermanence and reversals
- CM-N-FNRBFraction of non-renewable biomass (fNRB)
- CM-N-DURABILITY-MEASUREMENTDurability of the storage
- CM-N-FEEDSTOCK-SUSTAINABILITYSustainability of the feedstock
- CM-N-END-USE-TRACKINGTracking of the end use
The general rules apply as well. Read the general rules.
The rules of methodology v2.2, as they were: the archived v2.2 page.
History and transitions
-
v03.0adopted 8 Sept 2022source
Introduce reference to “TOOL33: Default values for common parameters”; Make minor editorial improvements; and Remove reference to “AMS-I.F.: Renewable electricity generation for captive use and mini-grid”.
-
v02.0adopted 28 Nov 2014source
Simplify the monitoring procedures for consumers under grid extensions (e.g. using prepaid electricity purchase devices) in response to the request for revision SSC_714.
-
v01.0adopted 11 May 2012source
Initial adoption.
Projects using AMS-III.BB
Browse 1 published project using AMS-III.BB, listed alphabetically. There is no ranking for this methodology yet: it appears here automatically once 5 of its projects not in the pipeline or under validation are rated. Open a project to view its registry details and the analysis available for that project.
Which registries list projects under AMS-III.BB?
In CarbonMeld's data, AMS-III.BB projects are on one registry: Verra (1 project, 0 registered).
| Registry | Projects | Registered | Projects list |
|---|---|---|---|
| Verra (VCS) | 1 | 0 | See the list |
Counts of project records in CarbonMeld's data, with or without a CarbonMeld analysis. «Registered» counts the records whose current registry status is «registered», as last read (20 November 2026); projects in a later status, such as awaiting verification approval, late to verify or completed, are not in that column.
- Analysis: No rating yet
