Skip to main content
Rankings · methodology

Top AM0015 projects

12 rated projects in this methodology · average score 5.5/10 · ranked by CarbonMeld's document-based assessment scores across all four dimensions: integrity, transparency, claim safety and documentation.

← All leaderboards · Full database

#1Equipav Bagasse Cogeneration Project (EBCP)CDMBrazilBiomassRegistry: Registered6.5/10#2Iturama Bagasse Cogeneration Project (IBCP)CDMBrazilBiomassRegistry: Registered6.4/10#3Cerradinho Bagasse Cogeneration Project (CBCP)CDMBrazilBiomassRegistry: Registered6.1/10
  1. 4
    Cruz Alta Bagasse Cogeneration Project (CABCP)CDMBrazilBiomassRegistry: Registered
    6.1
  2. 5
    Alta Mogiana Bagasse Cogeneration Project (AMBCP)CDMBrazilBiomassRegistry: Registered
    5.4
  3. 65.4
  4. 7
    Colombo Bagasse Cogeneration Project (CBCP)CDMBrazilBiomassRegistry: Registered
    5.4
  5. 8
    Campo Florido Bagasse Cogeneration Project (CFBCP)CDMBrazilBiomassRegistry: Registered
    5.3
  6. 9
    Alto Alegre Bagasse Cogeneration Project (AABCP)CDMBrazilBiomassRegistry: Registered
    5.1
  7. 105.1
  8. 114.9
  9. 12
    Coruripe Bagasse Cogeneration Project (CBCP)CDMBrazilBiomassRegistry: Registered
    4.5

Rank is by document-based assessment score only. The registry status shown next to each project is a separate fact: inclusion in this ranking is not a statement of current validity or credit eligibility — projects suspended, withdrawn or terminated by their registry can still appear, with their status labelled. Read the methodology.