Skip to main content
CarbonMeld CarbonMeld Carbon Observatory

AM0078 — Point of Use Abatement Device to Reduce SF6 emissions in LCD Manufacturing Operations

About this methodology

Projects install equipment to destroy SF6 used in liquid crystal display manufacturing. The method measures greenhouse gas emissions prevented from escaping to the atmosphere.

Version
2.0.0 · source ·
Status
Active at CDM / UNFCCC · source ·
Climate outcome
Emission reductions
Activity
Electronics
Official page
cdm.unfccc.int ·

How methodology v3 reads projects of this type

What CarbonMeld reads

  • shown

    Grid emission factor: the methodology sets rules for it in some cases. CarbonMeld reads it in the project's documents. CM-F-AM0078-GRID-EF

    Link
  • A confirmed investment analysis A-INVEST

    The documents show a project-level additionality test, the validation confirmed it, and it is an investment analysis (a numeric test of the project's finances with and without carbon revenue).

Set by the methodology or the programme, not assessed by our current method

  • not assessed

    No legal requirement for the activity: the methodology sets rules for it (AM0078 v02.0.0 baseline and additionality, p. 3). Our current method does not assess it. CM-F-AM0078-REGULATORY-SURPLUS

    Link
  • not assessed

    Social safeguards and consent of communities (FPIC): any such rules come from the programme, not the methodology. Our current method does not assess it. CM-F-AM0078-SAFEGUARDS-FPIC

    Link

Not applicable to this type — never a gap in our current method

The criterion does not apply to this methodology. Our current method never counts it as a gap.

The general rules apply as well. Read the general rules.

The rules of methodology v2.2, as they were: the archived v2.2 page.

History and transitions

  • v02.0.0adopted 2 Mar 2012source

    Improve and reorganize the procedure to determine the amount of eligible SF6 that would be emitted in the baseline; Change the default value of the fraction of SF6 consumed but not destroyed or transformed in the process to account for the …

  • v01.1adopted 28 May 2009source

    Editorial revision to clarify the applicability conditions.

  • v01adopted 13 Feb 2009source

    Initial adoption.

Projects using AM0078

Browse 4 published projects using AM0078, listed alphabetically. There is no ranking for this methodology yet: it appears here automatically once 5 of its projects not in the pipeline or under validation are rated. Open a project to view its registry details and the analysis available for that project.

Which registries list projects under AM0078?

In CarbonMeld's data, AM0078 projects are on one registry: CDM (4 projects, 1 registered).

RegistryProjectsRegisteredProjects list
CDM (UNFCCC)41See the list

Counts of project records in CarbonMeld's data, with or without a CarbonMeld analysis. «Registered» counts the records whose current registry status is «registered», as last read (15 November 2026); projects in a later status, such as awaiting verification approval, late to verify or completed, are not in that column.

← All leaderboards · Full database