Buffer pool: the methodology sets rules for it (VM0037 v1.0 VCU calculation, p. 53). CarbonMeld reads it in the project's documents. CM-F-VM0037-BUFFER
VM0037 — Methodology for Implementation of REDD+ Activities in Landscapes Affected by Mosaic Deforestation and Degradation
About this methodology
Projects address scattered deforestation and forest degradation and may also establish or restore forests. The method measures avoided forest emissions and additional carbon stored through forest growth.
- Issued by
- Verra (VCS) · issuer's site
- Last published version
- 1.0 · source ·
- Status
- Inactive at Verra / Verified Carbon Standard · source ·
- Climate outcome
- Emission reductions and CO2 removals
- Activity
- Forestry
- Official page
- verra.org ·
How methodology v3 reads projects of this type
What CarbonMeld reads
- shown
A confirmed investment analysis A-INVEST
The documents show a project-level additionality test, the validation confirmed it, and it is an investment analysis (a numeric test of the project's finances with and without carbon revenue).
Leakage not addressed (forest and land) Q-LEAKAGE-NOT-ADDRESSED
Forest, wetland, peat, grassland and soil carbon: the documents read do not address leakage. Outside REDD+ and reforestation, the rule applies only where the methodology requires a leakage assessment. At the listing stage, the rule does not apply if the programme's listing form has no section on leakage. CarbonMeld applies this rule only where a check of the documents has confirmed its condition; without that check, the rule takes no points.
Where carbon is stored: the permanence start P-START
CarbonMeld scores permanence only for projects that store carbon. Forest projects start from CCQI's grade of the programme on criterion 3.2. CCQI grades this criterion by programme, so its grade applies to every methodology of the programme. Where CCQI does not grade the programme, permanence starts at the neutral 5.0: the CDM's grade does not stand in for another programme's approach to permanence. Direct air capture with storage, biogenic emissions capture with storage, other geological storage and biochar start at the top, 8.0. The EU classes these types as permanent carbon removals. Enhanced weathering also starts at 8.0. It shares a family with direct air capture. This start is our own judgement. Concrete carbonation, ocean alkalinity, buried biomass and long-lived materials start at the neutral 5.0. These types have no class in a public source.
Forests: CCQI's grade of the programme.
Set by the methodology or the programme, not assessed by our current method
- not assessed
No legal requirement for the activity: the methodology sets rules for it. Our current method does not assess it. CM-F-VM0037-REGULATORY-SURPLUS
- not assessed
Social safeguards and consent of communities (FPIC): the methodology sets rules for it. Our current method does not assess it. CM-F-VM0037-SAFEGUARDS-FPIC
- not assessed
Our current method does not check how realistic the baseline scenario of the project is. An example is the rate of deforestation that the project compares with. CM-F-VM0037-BASELINE-REALISM
Not applicable to this type — never a gap in our current method
The criterion does not apply to this methodology. Our current method never counts it as a gap.
- CM-N-GRID-EFGrid emission factor
- CM-N-FNRBFraction of non-renewable biomass (fNRB)
- CM-N-USAGEUsage rate of the devices
- CM-N-DURABILITY-MEASUREMENTDurability of the storage
- CM-N-FEEDSTOCK-SUSTAINABILITYSustainability of the feedstock
- CM-N-END-USE-TRACKINGTracking of the end use
The general rules apply as well. Read the general rules.
The rules of methodology v2.2, as they were: the archived v2.2 page.
History and transitions
Transition to VM0048
VM0037 Methodology for Implementation of REDD+ Activities in Landscapes Affected by Mosaic Deforestation and Degradation, v1.0
Dates and conditions (4)
- Verra inactivated VM0037 on 27 November 2023: projects had to request listing as under validation before 27 February 2024 and complete validation by 27 November 2024; those validated may then use it until they have to move to VM0048. source ·
- So far VM0048 has one module, VMD0055, for avoided unplanned deforestation; a module for planned deforestation is being developed and one for forest degradation is being explored. source ·
- Verra requires the move to VM0048 only where the module and the data for the project's region exist.
- Verra will inactivate the older REDD methodologies, with grace periods, once modules and data for all REDD activities exist under VM0048.
-
v1.0active from 3 Nov 2017last publishedsource
Projects using VM0037
Browse 7 published projects using VM0037, listed alphabetically. There is no ranking for this methodology yet: it appears here automatically once 5 of its projects not in the pipeline or under validation are rated. Open a project to view its registry details and the analysis available for that project.
Which registries list projects under VM0037?
In CarbonMeld's data, VM0037 projects are on one registry: Verra (7 projects, 0 registered).
| Registry | Projects | Registered | Projects list |
|---|---|---|---|
| Verra (VCS) | 7 | 0 | See the list |
Counts of project records in CarbonMeld's data, with or without a CarbonMeld analysis. «Registered» counts the records whose current registry status is «registered», as last read (20 November 2026); projects in a later status, such as awaiting verification approval, late to verify or completed, are not in that column.
- Analysis: No rating yet
- Analysis: No rating yet
- Analysis: No rating yet
- Analysis: No rating yet
- Analysis: No rating yet
- Analysis: No rating yet
- Analysis: No rating yet