No legal requirement for the activity: the methodology sets rules for it. Our current method does not assess it. CM-F-REDD-VM0007-VM0048-REGULATORY-SURPLUS
VM0048 — Reducing Emissions from Deforestation and Forest Degradation
About this methodology
Projects prevent unplanned deforestation using a framework with activity-specific modules. The method measures avoided forest carbon losses against a baseline allocated from jurisdictional deforestation data.
- Issued by
- Verra (VCS) · issuer's site
- Version
- 1.0 · source ·
- Status
- Active at Verra / Verified Carbon Standard · source ·
- Climate outcome
- Emission reductions
- Activity
- Forestry
- ICVCM Core Carbon Principles
- Approved by the ICVCM for Verified Carbon Standard, version(s) 1.0 (source) ·
- Official page
- verra.org ·
Approval applies to the programs and versions listed. The official decision and project-specific conditions must also be met for credits to carry a CCP label; this is not a label for the projects on this page.
How methodology v3 reads projects of this type
What CarbonMeld reads
A confirmed investment analysis A-INVEST
The documents show a project-level additionality test, the validation confirmed it, and it is an investment analysis (a numeric test of the project's finances with and without carbon revenue).
A zero leakage deduction under Verra's older REDD+ methodologies Q-LEAKAGE-ZERO
Under VM0006, VM0007, VM0009 or VM0015 (not VM0048, nor the jurisdictional frameworks), the total leakage deduction of the latest monitored period in the documents read is zero. The deduction is half a step. A zero leakage deduction can be correct if the project moves no commodity production to another place.
A buffer share under the programme's minimum P-BUFFER-LOW
The share of credits the project puts in the programme's buffer pool is under the minimum that the programme publishes for the version of its risk tool in force for the project. Verra's AFOLU Non-Permanence Risk Tool sets a minimum of 10% in version 4.0, and of 12% from version 4.1. ACR's risk tool publishes no minimum, so the rule does not apply to ACR projects. CarbonMeld makes the comparison only where its reading of the page holds that minimum: today, for Verra's REDD+ and improved forest management pages analysed since the comparison was added. Elsewhere the rule takes no points.
Where carbon is stored: the permanence start P-START
CarbonMeld scores permanence only for projects that store carbon. Forest projects start from CCQI's grade of the programme on criterion 3.2. CCQI grades this criterion by programme, so its grade applies to every methodology of the programme. Where CCQI does not grade the programme, permanence starts at the neutral 5.0: the CDM's grade does not stand in for another programme's approach to permanence. Direct air capture with storage, biogenic emissions capture with storage, other geological storage and biochar start at the top, 8.0. The EU classes these types as permanent carbon removals. Enhanced weathering also starts at 8.0. It shares a family with direct air capture. This start is our own judgement. Concrete carbonation, ocean alkalinity, buried biomass and long-lived materials start at the neutral 5.0. These types have no class in a public source.
Forests: CCQI's grade of the programme.
Deductions that can apply
Leakage not addressed (forest and land) Q-LEAKAGE-NOT-ADDRESSED
Forest, wetland, peat, grassland and soil carbon: the documents read do not address leakage. Outside REDD+ and reforestation, the rule applies only where the methodology requires a leakage assessment. At the listing stage, the rule does not apply if the programme's listing form has no section on leakage. CarbonMeld applies this rule only where a check of the documents has confirmed its condition; without that check, the rule takes no points.
Set by the methodology or the programme, not assessed by our current method
- not assessed
- not assessed
Social safeguards and consent of communities (FPIC): the methodology sets rules for it (VCS Standard v4.7, p. 46). Our current method does not assess it. CM-F-REDD-VM0007-VM0048-SAFEGUARDS-FPIC
- not assessed
Our current method does not check how realistic the baseline scenario of the project is. An example is the rate of deforestation that the project compares with. CM-F-REDD-VM0007-VM0048-BASELINE-REALISM
Not applicable to this type — never a gap in our current method
The criterion does not apply to this methodology. Our current method never counts it as a gap.
- CM-N-GRID-EFGrid emission factor
- CM-N-FNRBFraction of non-renewable biomass (fNRB)
- CM-N-USAGEUsage rate of the devices
- CM-N-DURABILITY-MEASUREMENTDurability of the storage
- CM-N-FEEDSTOCK-SUSTAINABILITYSustainability of the feedstock
- CM-N-END-USE-TRACKINGTracking of the end use
The general rules apply as well. Read the general rules.
The rules of methodology v2.2, as they were: the archived v2.2 page.
History and transitions
Transition from VM0006 · VM0007 · VM0009 · VM0015 · VM0037
source: VM0006 · VM0007 · VM0009 · VM0015 · VM0037
Dates and conditions (13)
- Projects that start development after 27 November 2023 must use VM0048 once the deforestation risk map for their region has been available for six months; until then they may use VM0006, VM0007 or VM0015. source ·
- Registered projects must adopt VM0048 at their next verification after the risk map for their region has been available for six months.
- Projects that request listing after the risk map for their region has been available for six months must use VM0048.
- So far VM0048 has one module, VMD0055, for avoided unplanned deforestation; a module for planned deforestation is being developed and one for forest degradation is being explored. source ·
- Verra requires the move to VM0048 only where the module and the data for the project's region exist.
- Verra will inactivate the older REDD methodologies, with grace periods, once modules and data for all REDD activities exist under VM0048.
- VM0007 stays in force for the projects that use it, until they have to move to VM0048. source ·
- Projects that had not started public comment by 27 November 2023 had until 27 February 2024 to start it with VM0007 v1.6, and until 27 February 2025 to complete validation with that version. source ·
- To keep using VM0007 v1.7, new projects had to be listed as under validation by 4 October 2024 and complete validation or baseline reassessment by 4 October 2025; they may then use it until they have to move to VM0048 or until their next baseline reassessment or crediting period renewal, whichever comes first. source ·
- Verra inactivated VM0009 on 27 November 2023: projects had to request listing as under validation before 27 February 2024 and complete validation by 27 November 2024; those validated may then use it until they have to move to VM0048. source ·
- VM0015 stays in force for the projects that use it, until they have to move to VM0048. source ·
- Projects that had not started public comment by 19 December 2023 had until 19 March 2024 to start it with VM0015 v1.1, and until 19 March 2025 to complete validation with that version.
- Verra inactivated VM0037 on 27 November 2023: projects had to request listing as under validation before 27 February 2024 and complete validation by 27 November 2024; those validated may then use it until they have to move to VM0048. source ·
-
v1.0active from 27 Nov 2023currentsource
Initial version
Projects using VM0048
Browse 42 published projects using VM0048, listed alphabetically. There is no ranking for this methodology yet: it appears here automatically once 5 of its projects not in the pipeline or under validation are rated. Open a project to view its registry details and the analysis available for that project.
Which registries list projects under VM0048?
In CarbonMeld's data, VM0048 projects are on one registry: Verra (42 projects, 0 registered).
| Registry | Projects | Registered | Projects list |
|---|---|---|---|
| Verra (VCS) | 42 | 0 | See the list |
Counts of project records in CarbonMeld's data, with or without a CarbonMeld analysis. «Registered» counts the records whose current registry status is «registered», as last read (20 November 2026); projects in a later status, such as awaiting verification approval, late to verify or completed, are not in that column.
- Analysis: No rating yet
- Analysis: No rating yet
- Analysis: No rating yet
- Analysis: No rating yet
- Analysis: No rating yet
- Analysis: Not registered
- Analysis: Not registered
- Analysis: Not registered
- Analysis: No rating yet
- Analysis: Not registered
- Analysis: No rating yet
- Analysis: No rating yet
- Analysis: No rating yet
- Analysis: No rating yet
- Analysis: Not registered
- Analysis: No rating yet
- Analysis: No rating yet
- Analysis: No rating yet
- Analysis: No rating yet
- Analysis: No rating yet
- Analysis: No rating yet
- Analysis: No rating yet
- Analysis: No rating yet
- Analysis: No rating yet
- Analysis: No rating yet
- Analysis: No rating yet
- Analysis: No rating yet
- Analysis: No rating yet
- Analysis: No rating yet
- Analysis: No rating yet
- Analysis: No rating yet
- Analysis: No rating yet
- Analysis: Not registered
- Analysis: No rating yet
- Analysis: No rating yet
- Analysis: No rating yet
- Analysis: No rating yet
- Analysis: No rating yet
- Analysis: No rating yet
- Analysis: No rating yet
- Analysis: No rating yet
- Analysis: No rating yet
