AM0063 — Recovery of CO2 from tail gas in industrial facilities to substitute the use of fossil fuels for production of CO2
About this methodology
Projects recover CO2 from industrial tail gas or intermediate gas streams instead of producing it by burning fossil fuels. The method measures emissions avoided in CO2 production and accounts for the energy used in recovery.
- Issued by
- CDM (UNFCCC) · issuer's site
- Version
- 1.2.0 · source ·
- Status
- Active at CDM / UNFCCC · source ·
- Climate outcome
- Emission reductions
- Activity
- Industrial processes
- Official page
- cdm.unfccc.int ·
How methodology v3 reads projects of this type
What CarbonMeld reads
- shown
- shown
Leakage: the methodology sets rules for it in some cases (AM0063 v01.2.0 Leakage, p. 19). CarbonMeld reads it in the project's documents. CM-F-AM0063-LEAKAGE
A confirmed investment analysis A-INVEST
The documents show a project-level additionality test, the validation confirmed it, and it is an investment analysis (a numeric test of the project's finances with and without carbon revenue).
Set by the methodology or the programme, not assessed by our current method
- not assessed
No legal requirement for the activity: the methodology sets rules for it. Our current method does not assess it. CM-F-AM0063-REGULATORY-SURPLUS
- not assessed
Social safeguards and consent of communities (FPIC): any such rules come from the programme, not the methodology. Our current method does not assess it. CM-F-AM0063-SAFEGUARDS-FPIC
Not applicable to this type — never a gap in our current method
The criterion does not apply to this methodology. Our current method never counts it as a gap.
- CM-N-BUFFERBuffer pool
- CM-N-PERMANENCE-REVERSALPermanence and reversals
- CM-N-FNRBFraction of non-renewable biomass (fNRB)
- CM-N-USAGEUsage rate of the devices
- CM-N-DURABILITY-MEASUREMENTDurability of the storage
- CM-N-FEEDSTOCK-SUSTAINABILITYSustainability of the feedstock
- CM-N-END-USE-TRACKINGTracking of the end use
The general rules apply as well. Read the general rules.
The rules of methodology v2.2, as they were: the archived v2.2 page.
History and transitions
-
v01.2.0adopted 3 Jun 2011source
Amendment to expand the applicability of the methodology to new integrated industrial facilities recovering CO2 from the intermediate gas and reducing emissions associated with CO2 production in other conventional CO2 production facilities …
-
v01.1adopted 16 May 2008source
“Tool to calculate baseline, project and/or leakage emissions from electricity consumption” replaces the withdrawn “Tool to calculate project emissions from electricity consumption”.
-
v01adopted 30 Nov 2007source
Initial adoption.
Projects using AM0063
Browse 2 published projects using AM0063, listed alphabetically. There is no ranking for this methodology yet: it appears here automatically once 5 of its projects not in the pipeline or under validation are rated. Open a project to view its registry details and the analysis available for that project.
Which registries list projects under AM0063?
In CarbonMeld's data, AM0063 projects are on one registry: CDM (2 projects, 1 registered).
| Registry | Projects | Registered | Projects list |
|---|---|---|---|
| CDM (UNFCCC) | 2 | 1 | See the list |
Counts of project records in CarbonMeld's data, with or without a CarbonMeld analysis. «Registered» counts the records whose current registry status is «registered», as last read (20 November 2026); projects in a later status, such as awaiting verification approval, late to verify or completed, are not in that column.
- Analysis: No rating yet
- Analysis: No rating yet