Additionality: the methodology itself gives it (CAR CAAP V1.0 §3.4, p. 22). The project needs no test of its own. CM-F-CAR-ADIPIC-ACID-CN-ADDITIONALITY
CAR-CN-ADIPIC-ACID — China Adipic Acid Production Protocol
About this methodology
Projects at adipic acid production facilities in China reduce their nitrous oxide emissions. The protocol accounts for those emission reductions.
- Issued by
- Climate Action Reserve (CAR) · issuer's site
- Version
- 1.0 · source ·
- Status
- Active at Climate Action Reserve · source ·
- Climate outcome
- Emission reductions
- Activity
- Chemicals
- ICVCM Core Carbon Principles
- Approved by the ICVCM for Climate Action Reserve (CAR), version(s) 1.0 (source) ·
- Official page
- climateactionreserve.org ·
Approval applies to the programs and versions listed. The official decision and project-specific conditions must also be met for credits to carry a CCP label; this is not a label for the projects on this page.
How methodology v3 reads projects of this type
What CarbonMeld reads
- Integrity shown
- shown
Grid emission factor: the methodology sets rules for it in some cases (CAR CAAP V1.0 Equation 5.14, p. 40). CarbonMeld reads it in the project's documents. CM-F-CAR-ADIPIC-ACID-CN-GRID-EF
- shown
Leakage: the methodology sets rules for it (CAR CAAP V1.0 §5.1.2, p. 33). CarbonMeld reads it in the project's documents. CM-F-CAR-ADIPIC-ACID-CN-LEAKAGE
Figures set against the methodology's own values
- Integrity comparison
The crediting period is 10 years (p. 21). CarbonMeld compares the length of the period with it. CM-F-CAR-ADIPIC-ACID-CN-CREDITING-LENGTH
crediting period: 10 years
Set by the methodology or the programme, not assessed by our current method
- not assessed
No legal requirement for the activity: the methodology sets rules for it (CAR CAAP V1.0 §3.4.2, p. 23). Our current method does not assess it. CM-F-CAR-ADIPIC-ACID-CN-REGULATORY-SURPLUS
- not assessed
Social safeguards and consent of communities (FPIC): the methodology sets rules for it in some cases (CAR CAAP V1.0 §3.5, p. 25). Our current method does not assess it. CM-F-CAR-ADIPIC-ACID-CN-SAFEGUARDS-FPIC
Not applicable to this type — never a gap in our current method
The criterion does not apply to this methodology. Our current method never counts it as a gap.
- CM-N-BUFFERBuffer pool
- CM-N-PERMANENCE-REVERSALPermanence and reversals
- CM-N-FNRBFraction of non-renewable biomass (fNRB)
- CM-N-USAGEUsage rate of the devices
- CM-N-DURABILITY-MEASUREMENTDurability of the storage
- CM-N-FEEDSTOCK-SUSTAINABILITYSustainability of the feedstock
- CM-N-END-USE-TRACKINGTracking of the end use
Validation report: this protocol has none. A verification body confirms the project. Our current method never counts the missing report as a gap.
The general rules apply as well. Read the general rules.
The rules of methodology v2.2, as they were: the archived v2.2 page.
Projects using CAR-CN-ADIPIC-ACID
Browse 3 published projects using CAR-CN-ADIPIC-ACID, listed alphabetically. There is no ranking for this methodology yet: it appears here automatically once 5 of its projects not in the pipeline or under validation are rated. Open a project to view its registry details and the analysis available for that project.
Which registries list projects under CAR-CN-ADIPIC-ACID?
In CarbonMeld's data, CAR-CN-ADIPIC-ACID projects are on one registry: Climate Action Reserve (3 projects, 0 registered).
| Registry | Projects | Registered | Projects list |
|---|---|---|---|
| Climate Action Reserve (CAR) | 3 | 0 | See the list |
Counts of project records in CarbonMeld's data, with or without a CarbonMeld analysis. «Registered» counts the records whose current registry status is «registered», as last read (20 November 2026); projects in a later status, such as awaiting verification approval, late to verify or completed, are not in that column.
- Analysis: Re-assessment pending
- Analysis: Re-assessment pending
- Analysis: Re-assessment pending
