Grid emission factor: the methodology sets rules for it in some cases. CarbonMeld reads it in the project's documents. CM-F-ACM0017-GRID-EF
ACM0017 — Production of biofuel
About this methodology
Projects produce biofuel for vehicles or stationary equipment. The method measures emission reductions from replacing fossil fuels, accounting for emissions associated with the biofuel supply.
- Issued by
- CDM (UNFCCC) · issuer's site
- Version
- 4.0 · source ·
- Status
- Active at CDM / UNFCCC · source ·
- Climate outcome
- Emission reductions
- Activity
- Transport and energy
- Official page
- cdm.unfccc.int ·
- Also used by projects of
- Verra (VCS) (5 projects)
- International Carbon Registry (ICR) (4 projects)
- Global Carbon Council (GCC) (2 projects)
1 more
- Universal Carbon Registry (UCR) (1 project)
How methodology v3 reads projects of this type
What CarbonMeld reads
- shown
- shown
Leakage: the methodology sets rules for it (ACM0017 v04.0 Leakage paras 47–48, p. 17). CarbonMeld reads it in the project's documents. CM-F-ACM0017-LEAKAGE
A confirmed investment analysis A-INVEST
The documents show a project-level additionality test, the validation confirmed it, and it is an investment analysis (a numeric test of the project's finances with and without carbon revenue).
Set by the methodology or the programme, not assessed by our current method
- not assessed
No legal requirement for the activity: the methodology sets rules for it (ACM0017 v04.0 applicability 6, p. 6). Our current method does not assess it. CM-F-ACM0017-REGULATORY-SURPLUS
- not assessed
Sustainability of the feedstock: the methodology sets rules for it in some cases (ACM0017 v04.0 applicability 6, p. 5). Our current method does not assess it. CM-F-ACM0017-FEEDSTOCK-SUSTAINABILITY
- not assessed
Tracking of the end use: the methodology sets rules for it (ACM0017 v04.0 applicability para 5, p. 4). Our current method does not assess it. CM-F-ACM0017-END-USE-TRACKING
- not assessed
Social safeguards and consent of communities (FPIC): any such rules come from the programme, not the methodology. Our current method does not assess it. CM-F-ACM0017-SAFEGUARDS-FPIC
Not applicable to this type — never a gap in our current method
The criterion does not apply to this methodology. Our current method never counts it as a gap.
- CM-N-BUFFERBuffer pool
- CM-N-PERMANENCE-REVERSALPermanence and reversals
- CM-N-FNRBFraction of non-renewable biomass (fNRB)
- CM-N-USAGEUsage rate of the devices
- CM-N-DURABILITY-MEASUREMENTDurability of the storage
The general rules apply as well. Read the general rules.
The rules of methodology v2.2, as they were: the archived v2.2 page.
History and transitions
Merges AM0047
AM0047 Version 2.0 Status Not Active --- replaced by ACM0017 Valid from 10 Aug 07 to 16 Oct 09
All 7 versions
-
v04.0adopted 11 Mar 2022source
Indicate the emission sources that are relevant in the calculation of project emissions associated with biomass and biomass residues, in line with “TOOL16: Project and leakage emissions from biomass” (version 05.0).
-
v03.1adopted 31 May 2017source
Editorial revision to correct paragraph numbering.
-
v03.0adopted 4 May 2017source
Include references to the tools “Project and leakage emissions from biomass”, “Project and leakage emissions from transportation of freight”, and “Upstream leakage emissions associated with fossil fuel use"; broaden the applicability of …
-
v02.1adopted 29 Sept 2011source
Amendment to: Simplify the determination of BDy (Quantity of biodiesel eligible for crediting in year y); Improve the methodology by including missing parameters in the monitoring table, removing not required parameters from the monitoring …
-
v02.0adopted 17 Sept 2010source
Clarify: That the methodology is not applicable for the dedicated plantations established on peatlands; That the possibility to account for the CO2 emissions resulting from changes in soil carbon stocks as zero applies only to perennial …
-
v01.1adopted 23 Mar 2010source
Editorial revision to: Correct Table 2, as emission factors for jatropha corresponded to Tropical Dry climates and not Tropical Wet climates; Remove inconsistencies between the methodology and the excel sheet used to calculate the emission …
-
v01.0adopted 16 Oct 2009source
Initial adoption. This methodology is a consolidation of the approved methodology AM0047, incorporating cases NM0228, NM0233 and incorporating elements based on the request for revision AM_REV_0071.
Projects using ACM0017
Browse 25 published projects using ACM0017, listed alphabetically. There is no ranking for this methodology yet: it appears here automatically once 5 of its projects not in the pipeline or under validation are rated. Open a project to view its registry details and the analysis available for that project.
Which registries list projects under ACM0017?
In CarbonMeld's data, ACM0017 projects are on 5 registries: CDM (13), Verra (5) and International Carbon Registry (4), and 2 more. Being listed on a registry is not the same as being registered: the «Registered» column counts the projects each registry shows as registered, and credits are issued only after each verification.
| Registry | Projects | Registered | Projects list |
|---|---|---|---|
| CDM (UNFCCC) | 13 | 2 | See the list |
| Verra (VCS) | 5 | 2 | See the list |
| International Carbon Registry (ICR) | 4 | 4 | See the list |
| Global Carbon Council (GCC) | 2 | 0 | See the list |
| Universal Carbon Registry (UCR) | 1 | 0 | See the list |
Counts of project records in CarbonMeld's data, with or without a CarbonMeld analysis. «Registered» counts the records whose current registry status is «registered», as last read (14 November 2026); projects in a later status, such as awaiting verification approval, late to verify or completed, are not in that column.
- Analysis: No rating yet
- Analysis: No rating yet
- Analysis: No rating yet
- Analysis: No rating yet
- Analysis: No rating yet
- Analysis: No rating yet
- Analysis: No rating yet
- Analysis: No rating yet
- Analysis: Re-assessment pending
- Analysis: No rating yet
- Analysis: No rating yet
- Analysis: No rating yet
- Analysis: No rating yet
- Analysis: Re-assessment pending
- Analysis: No rating yet
- Analysis: No rating yet
- Analysis: No rating yet
- Analysis: No rating yet
- Analysis: Rating withdrawn — under review
- Substitution of fossil fuels for the use of sustainable biofuels manufactured by Biotrading 2007 S.LAnalysis: Rating withdrawn — under review
- Substitution of fossil fuels for the use of sustainable biofuels manufactured by Green Fuel ExtremadAnalysis: Rating withdrawn — under review
- Substitution of fossil fuels for the use of sustainable biofuels manufactured by Iniciativas BioenerAnalysis: Rating withdrawn — under review
- Analysis: Re-assessment pending
- Analysis: No rating yet
- Analysis: No rating yet