Skip to main content
CarbonMeld CarbonMeld Carbon Observatory

AMS-III.AW — Electrification of rural communities by grid extension

About this methodology

Projects extend a predominantly renewable electricity grid to rural users without grid access. The method measures emissions avoided by replacing the fossil fuels those users would otherwise consume.

Version
2.0 · source ·
Status
Active at CDM / UNFCCC · source ·
Climate outcome
Emission reductions
Activity
Electricity
Official page
cdm.unfccc.int ·

How methodology v3 reads projects of this type

What CarbonMeld reads

  • shown

    Grid emission factor: the methodology sets rules for it (AMS-III.AW v02.0 applicability para 4, p. 3). CarbonMeld reads it in the project's documents. CM-F-AMS-III-AW-GRID-EF

    Link
  • A confirmed investment analysis A-INVEST

    The documents show a project-level additionality test, the validation confirmed it, and it is an investment analysis (a numeric test of the project's finances with and without carbon revenue).

Deductions that can apply

  • No additionality test in the documents (renewable energy) A-TEST-NOT-STATED

    Renewable energy, power generation and supply: the documents read state no additionality test. A test that the documents do not name is a different case. It takes no points. CarbonMeld applies this rule only where a check of the documents has confirmed its condition; without that check, the rule takes no points.

Set by the methodology or the programme, not assessed by our current method

  • not assessed

    Leakage: the methodology sets rules for it (AMS-III.AW v02.0 Leakage para 29, p. 8). Our current method does not assess it. CM-F-AMS-III-AW-LEAKAGE

    Link
  • not assessed

    Usage rate of the devices: the methodology sets rules for it. Our current method does not assess it. CM-F-AMS-III-AW-USAGE

    Link
  • not assessed

    Social safeguards and consent of communities (FPIC): any such rules come from the programme, not the methodology. Our current method does not assess it. CM-F-AMS-III-AW-SAFEGUARDS-FPIC

    Link

Not applicable to this type — never a gap in our current method

The criterion does not apply to this methodology. Our current method never counts it as a gap.

The general rules apply as well. Read the general rules.

The rules of methodology v2.2, as they were: the archived v2.2 page.

History and transitions

  • v02.0adopted 8 Sept 2022source

    Introduce reference to “TOOL33: Default values for common parameters”; Make minor editorial improvements; and Remove reference to “AMS-I.F.: Renewable electricity generation for captive use and mini-grid”.

  • v01.0adopted 2 Mar 2012source

    Initial adoption.

Projects using AMS-III.AW

Browse 1 published project using AMS-III.AW, listed alphabetically. There is no ranking for this methodology yet: it appears here automatically once 5 of its projects not in the pipeline or under validation are rated. Open a project to view its registry details and the analysis available for that project.

Which registries list projects under AMS-III.AW?

In CarbonMeld's data, AMS-III.AW projects are on one registry: CDM (1 project, 1 registered).

RegistryProjectsRegisteredProjects list
CDM (UNFCCC)11See the list

Counts of project records in CarbonMeld's data, with or without a CarbonMeld analysis. «Registered» counts the records whose current registry status is «registered», as last read (20 November 2026); projects in a later status, such as awaiting verification approval, late to verify or completed, are not in that column.

← All leaderboards · Full database