Grid emission factor: the methodology sets rules for it. CarbonMeld reads it in the project's documents. CM-F-AM0042-GRID-EF
AM0042 — Grid-connected electricity generation using biomass from newly developed dedicated plantations
About this methodology
Projects establish dedicated biomass plantations and use the harvested biomass in new grid-connected power plants. The method measures grid emissions displaced by the electricity and deducts project and biomass-supply emissions.
- Issued by
- CDM (UNFCCC) · issuer's site
- Last published version
- 2.1 · source ·
- Status
- Withdrawn at CDM / UNFCCC · source ·
- Climate outcome
- Emission reductions
- Activity
- Electricity
- Official page
- cdm.unfccc.int ·
How methodology v3 reads projects of this type
What CarbonMeld reads
- shown
A confirmed investment analysis A-INVEST
The documents show a project-level additionality test, the validation confirmed it, and it is an investment analysis (a numeric test of the project's finances with and without carbon revenue).
Deductions that can apply
No additionality test in the documents (renewable energy) A-TEST-NOT-STATED
Renewable energy, power generation and supply: the documents read state no additionality test. A test that the documents do not name is a different case. It takes no points. CarbonMeld applies this rule only where a check of the documents has confirmed its condition; without that check, the rule takes no points.
Set by the methodology or the programme, not assessed by our current method
- not assessed
Leakage: the methodology sets rules for it (AM0042 v02.1 Leakage, p. 15). Our current method does not assess it. CM-F-AM0042-LEAKAGE
- not assessed
No legal requirement for the activity: the methodology sets rules for it. Our current method does not assess it. CM-F-AM0042-REGULATORY-SURPLUS
- not assessed
Sustainability of the feedstock: the methodology sets rules for it (AM0042 v02.1 applicability, p. 2). Our current method does not assess it. CM-F-AM0042-FEEDSTOCK-SUSTAINABILITY
- not assessed
Social safeguards and consent of communities (FPIC): any such rules come from the programme, not the methodology. Our current method does not assess it. CM-F-AM0042-SAFEGUARDS-FPIC
Not applicable to this type — never a gap in our current method
The criterion does not apply to this methodology. Our current method never counts it as a gap.
- CM-N-BUFFERBuffer pool
- CM-N-PERMANENCE-REVERSALPermanence and reversals
- CM-N-FNRBFraction of non-renewable biomass (fNRB)
- CM-N-USAGEUsage rate of the devices
- CM-N-DURABILITY-MEASUREMENTDurability of the storage
- CM-N-END-USE-TRACKINGTracking of the end use
The general rules apply as well. Read the general rules.
The rules of methodology v2.2, as they were: the archived v2.2 page.
History and transitions
Replaced by ACM0018
withdrawn at CDM Executive Board meeting 99
AM0042 | Grid-connected electricity generation using biomass from newly developed dedicated plantations --- Version 2.1 | ACM0018 | EB 99
-
v02.1adopted 30 Jul 2010source
Editorial revision to: Revise the monitoring procedure of the biomass moisture content so that the parameter can be monitored for each batch of biomass, rather than continuously.
-
v02adopted 19 Oct 2007source
Incorporate the use of the “Tool to calculate the emission factor for an electricity system”
-
v01adopted 1 Nov 2006source
Initial adoption
Projects using AM0042
Browse 2 published projects using AM0042, listed alphabetically. There is no ranking for this methodology yet: it appears here automatically once 5 of its projects not in the pipeline or under validation are rated. Open a project to view its registry details and the analysis available for that project.
Which registries list projects under AM0042?
In CarbonMeld's data, AM0042 projects are on one registry: CDM (2 projects, 0 registered).
| Registry | Projects | Registered | Projects list |
|---|---|---|---|
| CDM (UNFCCC) | 2 | 0 | See the list |
Counts of project records in CarbonMeld's data, with or without a CarbonMeld analysis. «Registered» counts the records whose current registry status is «registered», as last read (20 November 2026); projects in a later status, such as awaiting verification approval, late to verify or completed, are not in that column.
- Analysis: No rating yet
- Analysis: Not registered