Grid emission factor: the methodology sets rules for it (TOOL07 combined margin for the displaced grid electricity, p. 7). CarbonMeld reads it in the project's documents. CM-F-ACM0018-GRID-EF
ACM0018 — Electricity generation from biomass in power-only plants
About this methodology
Projects generate electricity from biomass through new plants, upgrades or fuel changes. The method measures displaced electricity emissions and, where applicable, avoided methane from decaying biomass.
- Issued by
- CDM (UNFCCC) · issuer's site
- Version
- 6.0 · source ·
- Status
- Active at CDM / UNFCCC · source ·
- Climate outcome
- Emission reductions
- Activity
- Electricity
- Official page
- cdm.unfccc.int ·
- Also used by projects of
- Verra (VCS) (7 projects)
- Global Carbon Council (GCC) (6 projects)
- Gold Standard (GS) (4 projects)
2 more
- CerCarbono (CC) (1 project)
- Universal Carbon Registry (UCR) (1 project)
How methodology v3 reads projects of this type
What CarbonMeld reads
- shown
A confirmed investment analysis A-INVEST
The documents show a project-level additionality test, the validation confirmed it, and it is an investment analysis (a numeric test of the project's finances with and without carbon revenue).
Deductions that can apply
No additionality test in the documents (renewable energy) A-TEST-NOT-STATED
Renewable energy, power generation and supply: the documents read state no additionality test. A test that the documents do not name is a different case. It takes no points. CarbonMeld applies this rule only where a check of the documents has confirmed its condition; without that check, the rule takes no points.
Set by the methodology or the programme, not assessed by our current method
- not assessed
Leakage: the methodology sets rules for it (ACM0018 v06, p. 37). Our current method does not assess it. CM-F-ACM0018-LEAKAGE
- not assessed
Sustainability of the feedstock: the methodology sets rules for it (ACM0018 v06 applicability, p. 5). Our current method does not assess it. CM-F-ACM0018-FEEDSTOCK-SUSTAINABILITY
- not assessed
Social safeguards and consent of communities (FPIC): any such rules come from the programme, not the methodology. Our current method does not assess it. CM-F-ACM0018-SAFEGUARDS-FPIC
Not applicable to this type — never a gap in our current method
The criterion does not apply to this methodology. Our current method never counts it as a gap.
- CM-N-BUFFERBuffer pool
- CM-N-PERMANENCE-REVERSALPermanence and reversals
- CM-N-FNRBFraction of non-renewable biomass (fNRB)
- CM-N-USAGEUsage rate of the devices
- CM-N-REGULATORY-SURPLUSNo legal requirement for the activity
- CM-N-DURABILITY-MEASUREMENTDurability of the storage
- CM-N-END-USE-TRACKINGTracking of the end use
The general rules apply as well. Read the general rules.
The rules of methodology v2.2, as they were: the archived v2.2 page.
History and transitions
Replaces AM0042
AM0042 | Grid-connected electricity generation using biomass from newly developed dedicated plantations --- Version 2.1 | ACM0018 | EB 99
Takes the scope of ACM0006
The applicability of the methodology was restricted to power and heat projects due to the approval of a new consolidated methodology ACM0018 for power-only projects. Power-only projects were excluded from this methodology.
All 9 versions
-
v06.0adopted 11 Mar 2022source
Indicate the emission sources that are relevant in the calculation of project emissions associated with biomass and biomass residues, in line with “TOOL16: Project and leakage emissions from biomass” (version 05.0); Make editorial …
-
v05.0adopted 14 Dec 2020source
Incorporate changes identified in ACM0006; Address inconsistencies and ambiguities in the language used in some parts of the methodology; Ensure consistency across the methodologies for biomass utilization.
-
v04.0adopted 22 Sept 2017source
Add reference to the methodological tool “Project and leakage emissions from biomass” (TOOL16); Streamline the determination of baseline and additionality demonstration.
-
v03.0adopted 8 Nov 2013source
Include project activities generating electricity using solar thermal technology in combination with biomass residues; Change the title from “Consolidated methodology for electricity generation from biomass residues in power-only plants” …
-
v02.0.0adopted 2 Mar 2012source
Incorporate reference to the tools: "Assessment of the validity of the original/current baseline and update of the baseline at the renewal of a crediting period"; "Tool for project and leakage emissions from road transportation of freight".
-
v01.3.0adopted 29 Sept 2011source
Amendment to: Broaden the applicability of the methodology by increasing the maximal share of the co-fired fossil fuels in the total fuel fired from 50% to 80% on an energy basis.
-
v01.2.0adopted 26 Nov 2010source
The methodology was revised to include project activities that process the biomass residues prior to combustion by means of pelletization, shredding and/or briquetting.
-
v01.1adopted 30 Jul 2010source
Editorial revision to: Revise the monitoring procedure of the biomass moisture content so that the parameter can be monitored for each batch of biomass, rather than continuously.
-
v01adopted 12 Feb 2010source
Initial adoption.
Projects using ACM0018
Browse 110 published projects using ACM0018, listed alphabetically. There is no ranking for this methodology yet: it appears here automatically once 5 of its projects not in the pipeline or under validation are rated. Open a project to view its registry details and the analysis available for that project.
Which registries list projects under ACM0018?
In CarbonMeld's data, ACM0018 projects are on 6 registries: CDM (91), Verra (7) and Global Carbon Council (6), and 3 more. Being listed on a registry is not the same as being registered: the «Registered» column counts the projects each registry shows as registered, and credits are issued only after each verification.
| Registry | Projects | Registered | Projects list |
|---|---|---|---|
| CDM (UNFCCC) | 91 | 60 | See the list |
| Verra (VCS) | 7 | 4 | See the list |
| Global Carbon Council (GCC) | 6 | 0 | See the list |
| Gold Standard (GS) | 4 | 4 | See the list |
| CerCarbono (CC) | 1 | 0 | See the list |
| Universal Carbon Registry (UCR) | 1 | 0 | See the list |
Counts of project records in CarbonMeld's data, with or without a CarbonMeld analysis. «Registered» counts the records whose current registry status is «registered», as last read (25 November 2026); projects in a later status, such as awaiting verification approval, late to verify or completed, are not in that column.
10 of these projects have no number: additionality, quantification or both have no public grade of their type of project that applies to them yet. Their pages give the reason and how many negative facts were found; the analysis is in Premium.
- Analysis: No rating yet
- Analysis: Not registered
- Analysis: Rated
- Analysis: No rating yet
- Analysis: No rating yet
- Analysis: No rating yet
- Analysis: No rating yet
- Analysis: Not yet assessable
- Analysis: No rating yet
- Analysis: No rating yet
- Analysis: No rating yet
- Analysis: No rating yet
- Analysis: No rating yet
- Analysis: No public grade applies yet
- Analysis: Rated
- Analysis: Re-assessment pending
- Analysis: Re-assessment pending
- Analysis: No rating yet
- Analysis: No rating yet
- Analysis: Not registered
- Analysis: No public grade applies yet
- Analysis: No public grade applies yet
- Analysis: No public grade applies yet
- Analysis: Rated
- Analysis: No rating yet
- Analysis: No rating yet
- Analysis: Re-assessment pending
- Analysis: No rating yet
- Analysis: No rating yet
- Analysis: No rating yet
- Analysis: No rating yet
- Analysis: No rating yet
- Analysis: Not registered
- Analysis: No rating yet
- Analysis: No rating yet
- Analysis: No rating yet
- Analysis: No rating yet
- Analysis: No rating yet
- Analysis: No public grade applies yet
- Analysis: Re-assessment pending
- Analysis: Re-assessment pending
- Analysis: No rating yet
- Analysis: Re-assessment pending
- Analysis: No public grade applies yet
- Analysis: Re-assessment pending
- Analysis: Re-assessment pending
- Analysis: No rating yet
- Analysis: No rating yet
- Analysis: Re-assessment pending
- Analysis: Not registered
- Analysis: No rating yet
- Analysis: Re-assessment pending
- Analysis: Re-assessment pending
- Analysis: Not registered
- Analysis: Re-assessment pending
- Analysis: No rating yet
- Analysis: Re-assessment pending
- Analysis: No public grade applies yet
- Analysis: No rating yet
- Analysis: No rating yet
- Analysis: No rating yet
- Analysis: No rating yet
- Analysis: No public grade applies yet
- Analysis: Not registered
- Analysis: No rating yet
- Analysis: No rating yet
- Analysis: No rating yet
- Analysis: Re-assessment pending
- Analysis: No rating yet
- Analysis: No rating yet
- Analysis: No rating yet
- Analysis: No rating yet
- Analysis: No public grade applies yet
- Analysis: Re-assessment pending
- Analysis: No rating yet
- Analysis: No rating yet
- Analysis: Re-assessment pending
- Analysis: No rating yet
- Analysis: No rating yet
- Analysis: No rating yet
- Analysis: No rating yet
- Analysis: No public grade applies yet
- Analysis: No rating yet
- Analysis: Not registered
- Analysis: Not registered
- Analysis: No rating yet
- Analysis: No rating yet
- Analysis: No rating yet
- Analysis: No rating yet
- Analysis: Re-assessment pending
- Analysis: No rating yet
- Analysis: No rating yet
- Analysis: No rating yet
- Analysis: Re-assessment pending
- Analysis: Not registered
- Analysis: No rating yet
- Analysis: Re-assessment pending
- Analysis: No rating yet
- Analysis: No rating yet
- Analysis: Not registered
- Analysis: No rating yet
- Analysis: No rating yet
- Analysis: No rating yet
- Analysis: No rating yet
- Analysis: No rating yet
- Analysis: No rating yet
- Analysis: Re-assessment pending
- Analysis: No rating yet
- Analysis: No rating yet
- Analysis: No rating yet
