Hebei Qiuxian Biomass Power Plant Project
#80of 352 in Biomass#515of 1084 in China#704of 1459 in CDM (UNFCCC)#3of 13 in ACM0018
Audit Analysis
The Hebei Qiuxian Biomass Power Plant is a CDM-registered biomass energy project with a solid investment-test additionality assessment confirmed by TÜV Rheinland, but the available record contains no monitoring report or verified emission reductions, leaving the project's actual performance unverified. The project-specific baseline and the absence of any permanence or buffer mechanism introduce moderate integrity risk, while the 0% leakage deduction is reasonable for a biomass power substitution. Overall, the project is methodologically sound at validation but lacks the post-validation evidence needed to confirm its claims.
Red Flags
- No monitoring report or verified emission reduction figures are present in the extracted record; the project's actual performance over its 2013–2019 crediting period is unconfirmed.
- Baseline is project-specific rather than jurisdictional, which is less conservative and more susceptible to methodological bias.
- No buffer pool, permanence mechanism, or reversal-risk assessment is documented, despite the project having completed its crediting period.
- Four contradictions between the validation report, PDD, and appendix (leakage treatment, additionality test type, ERR figures, baseline method) indicate internal document inconsistencies that were not fully harmonised.
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
Investment test confirmed by VVB
mixed evidence / unresolved risk
0% deduction, deemed negligible – reasonable for biomass pow
Project-specific baseline, not jurisdictional
Safeguards and benefit-sharing mentioned; FPIC and grievance
CORSIA and CCP status not stated in available documents
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →