Biomass Generation Project in Xun county, Henan province, P.R. China

CDM-3838 ↗

#16of 196 in Biomass#55of 204 in China#30of 213 in CDM (UNFCCC)#2of 6 in ACM0018

5.9/ 10
Integrity
6.2
Transparency
5.5
Claim Safety
5.5
Documentation
6.5

Audit Analysis

A CDM biomass energy project in Henan, China, with VVB-confirmed additionality and a reasonable ERR delivery rate (~97% of pro-rata expectation), but undermined by contradictions in baseline method and leakage justification between the PDD and monitoring report, along with several missing MRV details (fnrb, usage monitoring). The project is a lower-permanence-risk energy substitution, yet the documentation gaps and internal inconsistencies limit confidence in the credit quality.

Red Flags

  • Leakage justification is contradictory: the PDD (2017) states leakage was 'deemed negligible' while the monitoring report (2022) claims it was 'quantified,' yet the deduction is 0% in both cases — a quantified result of zero is internally inconsistent
  • Baseline method is contradictory: the validation report (2017) describes a 'jurisdictional' baseline while the monitoring report (2022) describes a 'project' baseline, creating uncertainty about which methodology actually underpins the credit
  • No buffer pool or permanence mechanism is documented, and no reversal events data is available, leaving permanence risk unquantified
  • Two material findings (CL-1, CL-2) in the monitoring report required provision of the ERR calculation spreadsheet and power purchase/grid connection agreements, indicating incomplete documentation at the time of verification

Credit Vintages

IssuedRetiredAvailable
2022
1,137,14701,137,147
Total1,137,14701,137,147

Risk Indicators

Additionality

VVB-confirmed, test type unspecified

Permanence

No buffer pool or reversal data; low inherent risk for energ

Leakage

0% deduction with contradictory justifications across docume

Baseline

Method contradiction (project vs jurisdictional); reassessed

Safeguards

Safeguards mentioned but FPIC and grievance mechanism not de

Double-claim

CORSIA and CCP status not stated in available documents

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-26ACM0018

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents