Biomass Power Generation Project by Everbright Alternative Energy (Dangshan) Limited

GS-336 ↗

4.9 / 10
Integrity
5.2
Transparency
4.8
Claim Safety
4.6
Documentation
5.1

Score Breakdown

Integrity

verified Additionality was confirmed by the VVB using a combined test, which supports the project’s core eligibility case.

missing Leakage treatment is weak because the verification report says it was not addressed, even though the monitoring report later called it negligible.

Transparency

verified The verification report names TÜV NORD JI/CDM Certification Program and the monitoring period is clearly stated as 2012-04-01 to 2013-03-31.

missing Total ERs claimed and verified are not stated in the extracted record, and several monitoring parameters were initially unsupported by actual data.

Claim Safety

verified The project uses ACM0018 under Gold Standard, and the verification report indicates additionality was checked by the VVB.

missing The baseline is project-specific and was last reassessed in 2012, while leakage handling remains inconsistent across documents.

Documentation

verified Four evidence documents were used, and the extraction confidence is high, which supports a reasonably complete record.

missing The verification report lists multiple material findings, showing that the original monitoring package had gaps before corrective actions were added.

Detailed Analysis

Integrity

The verification report confirms additionality through a combined test and shows the project was reviewed by TÜV NORD JI/CDM Certification Program. On the downside, the baseline is project-based and only noted as last reassessed in 2012, which is not especially strong for robustness. Leakage is a material weakness: the verification report says it was not addressed, while the monitoring report later described it as negligible, so the evidence is mixed and conservative scoring is warranted.

Transparency

The monitoring period is clearly stated and the VVB is identified, which helps traceability. However, the extracted record does not state total ERs claimed or verified, and several monitoring parameters were initially missing actual data in the verification report. The corrective actions later filled some of those gaps, but the record still reflects uneven disclosure quality.

Claim Safety

Claim safety is moderate because the project sits under a recognized methodology and additionality was VVB-confirmed. Still, the project-specific baseline and the leakage inconsistency create over-crediting risk. No CORSIA or CCP status is stated in the extracted record, so dual-claim risk cannot be ruled out from the available evidence.

Documentation

Documentation is fair but not strong: four documents were used and extraction confidence is high, which supports reliability. At the same time, the verification report lists several material findings about missing or unclear monitoring evidence, showing that the original documentation package was incomplete before revisions. The crediting period extends beyond the stated monitoring period, but the record does not provide enough detail to fully assess recency and completeness across all claims.

Overall

Overall, this is a mid-quality project record with some credible strengths but meaningful evidence gaps. I privileged the verification report over the monitoring report on leakage because it is the later, higher-priority assurance document, so the leakage issue remains a negative despite the earlier negligible statement. The contradiction between those documents, plus the missing ER totals and initial monitoring gaps, lowers confidence in the claim even though additionality and safeguards are reasonably supported.

Audit Analysis

The project has some strengths: additionality was confirmed by the VVB, safeguards were documented, and the verification report shows corrective actions were taken after monitoring gaps were identified. However, the record also shows weak leakage treatment, a project-specific baseline, and several documentation issues that reduce confidence in the claimed environmental performance.

Project Description

Developer: China Everbright International Limited Type: Biomass, or Liquid Biofuel - Electricity Size: Large scale Methodology: ACM0018 Electricity generation from biomass residues in power-only plants Crediting period: 2012-04-01 → 2019-03-31 Estimated annual credits: 162503 tCO2e SDGs: Goal 13: Climate Action, Goal 8: Decent Work and Economic Growth, Goal 7: Affordable and Clean Energy

Red Flags

  • The verification report says leakage was not addressed, while the monitoring report described it as negligible; this inconsistency weakens reliability.
  • The verification report identified missing or unclear monitoring evidence for air, water, soil, pollutants, and employment, indicating incomplete MRV at first pass.

Credit Vintages

Issued Retired Available
2012
127,686 0 127,686
2013
33,733 0 33,733
Total 161,419 0 161,419

Cosa migliorerebbe questo punteggio

  • Provide a fully reconciled leakage assessment with a quantified deduction or a clear, document-backed justification across all reports.
  • Disclose the total ERs claimed and verified, plus a complete monitoring table for all parameters with source-linked evidence.

Questi suggerimenti indicano quali prove pubbliche aggiuntive potrebbero migliorare il livello di confidenza di questa valutazione. Non garantiscono un punteggio futuro più alto.

Risk Indicators

Additionality

VVB-confirmed combined test

Permanence

Avoidance project; no reversal events reported

Leakage

Leakage inconsistency; not addressed in verification

Baseline

Project baseline; reassessment timing limited

Safeguards

FPIC and grievance mechanism documented

Double-claim

CORSIA/CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis Provenance Scored 2026-04-13 General Methodology v2.0 Documentazione completa

Sei il proprietario di questo progetto?

Correzione metadati (gratuita)

Nome, paese, marketplace o link errati? Segnalacelo.

Non modifica lo score.

[email protected]

Rivalutazione con nuovi documenti

Hai documentazione aggiornata non ancora inclusa? Puoi richiedere un nuovo run della pipeline con i nuovi input.

Invia Documenti