Hebei Wuqiao Biomass Generation Project
#215of 352 in Biomass#969of 1084 in China#1311of 1459 in CDM (UNFCCC)#12of 13 in ACM0018
Audit Analysis
The Hebei Wuqiao biomass project has VVB-confirmed additionality and a reasonable ERR delivery ratio (~95% of pro-rata expectation), but is undermined by 20 material findings in the PDD, 8 required corrective actions, three cross-document contradictions, and the absence of most key monitoring and sustainability parameters. The project's integrity and claim safety are further weakened by a project-specific baseline with a contradictory jurisdictional reference, a 0% leakage deduction with inconsistent documentation, and no buffer pool, LCA, or feedstock sustainability data in the extracted record.
Red Flags
- 20 material findings in the PDD including incorrect grid identification (Central China vs NCPG), boiler capacity unit error (130 t/d vs 130 t/h), wrong PEFF formula, and insufficient baseline scenario justifications
- 8 corrective actions required, including correction of site coordinates, boiler capacity, grid parameters, and the PEFF emission formula
- Contradiction in total ERR figures: 12,617 tCO2e (monitoring report, 27 Jan 2022) vs 1,112,858 tCO2e (monitoring report, 26 Jan 2022) — likely lifetime ex-ante vs single-month verified, but the same field label creates ambiguity
- Baseline method contradiction: 'project' (monitoring report, 2022) vs 'jurisdictional' (appendix, 2012)
- Leakage treatment contradiction: 'deemed negligible' (monitoring report, 2022) vs 'not addressed' (validation report, 2012)
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2022 | 1,115,341 | 0 | 1,115,341 | |
| Total | 1,115,341 | 0 | 1,115,341 |
Risk Indicators
VVB-confirmed combined test
mixed evidence / unresolved risk
0% deduction, inconsistent documentation
Project-specific, contradictory references
Mentioned but FPIC and grievance not detailed
CCP and CORSIA status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →