No public grade applies yet
Polo energético de biomasa
CarbonMeld's document-based rating gives Polo energético de biomasa (ECO-212) no number (No public grade applies yet): CarbonMeld read its documents, but its type of project does not yet have a public grade that applies to it on both additionality and quantification. The absence of a number says nothing about the project's quality.
Assessment
How this analysis was made
- Standard
- CerCarbono (CC)
- Our method
- CarbonMeld methodology v3 · documents read on 24 Oct 2026
Evidence
Eligibility & market
What can you claim with this credit?
Four checks buyers ask about, from the registry and the Integrity Council (ICVCM).
Airlines (CORSIA)
Not published
This registry does not publish CORSIA eligibility per project.
Integrity label (ICVCM CCP)
No ICVCM information
No CCP label and no ICVCM decision found for this project's methodology.
Removal or reduction
Emission reduction or avoidance
Prevents or reduces emissions — fits contribution claims, not SBTi neutralisation.
Source: project sector
Covers: the project type, not a label on individual credits
Paris Agreement (Article 6)
Not published
This registry does not publish Article 6 authorizations.
Information only, from public sources. Claim rules (CORSIA, SBTi, EU rules on green claims) change: check them before making a public claim. Since 27 September 2026, EU consumer rules do not allow “climate neutral” product claims based on offsets.
Credit Vintages
No issuances recorded on the registry.
Methodology versions used
The methodology version stated in each monitoring, verification and issuance document, by period, compared with the official methodology pages.
2020–2023ACM0018 v6.0current version
verification report
official page · verified on
- ACM0018: Active (CDM / UNFCCC) · official page · verified on
A version is shown only when the document's own text writes it next to the methodology code. Current versions, status and CCP ranges come from the official pages linked, checked on the date shown.
Where to buy
Got an offer for these credits? Check it against the registry →
+ Know where to buy this?
Listing multiple projects? Send us a CSV at listings@carbonmeld.com.
Profile & governance
Are you the project owner?
Full analysis (free for owners)
Owners get free access to the full analysis of their own project: every rule that raised or lowered the number, with the fact and the source it rests on, the negative facts' detail and the documents read. Write to us from your organisation's email address.
hello@carbonmeld.com →Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the rating.
hello@carbonmeld.com →Report an error on this page
Something wrong in the analysis, or a registry document we have not used? Send us the link to the public source: you get a reference and an answer within 30 days.
Report an error on this page →Cite this page
CarbonMeld (2026). Polo energético de biomasa (ECO-212): CarbonMeld document-based analysis, methodology v3, documents read on 24 Oct 2026. https://carbonmeld.com/projects/polo-energ-tico-de-biomasa/.
The citation names the analysis by its methodology version and the day the documents were read; the page gives no number.
Similar projects
Same methodology or sector, the same registry first.
- Hengshui TEDA Gucheng Biomass-based Power Generation ProjectCDM-7361
- Heilongjiang Bayan Biomass Cogeneration ProjectCDM-8978
- Lautaro Generation ProjectCDM-8099
- Ngodwana Biomass to Energy ProjectVCS-1982
- IOI Sandakan Biomass Power PlantCDM-9326
- Biomass Power Generation Project by Everbright Alternative Energy (Dangshan) LimitedCDM-4079
- BIOVEA Renewable Biomass-to-energy project at AboissoCDM-8819
- Biomass Generation Project in Xun county, Henan province, P.R. ChinaCDM-3838
