Heilongjiang Bayan Biomass Cogeneration Project
#179of 352 in Biomass#883of 1084 in China#1174of 1459 in CDM (UNFCCC)#11of 13 in ACM0018
Audit Analysis
A CDM biomass cogeneration project in China with VVB-confirmed additionality but a troubling record of 14 material findings involving fundamental calculation errors (dry vs. wet basis, missing data, non-conservative grid EF). The verified ERR of 172,097 represents only about 13% of the 1,305,842 claimed in the monitoring report, raising serious over-crediting concerns. The project-specific baseline, 2008 grid emission factor, and weak leakage justification further erode confidence in the credit quality.
Red Flags
- Verified ERR (172,097) is only ~13% of the claimed ERR (1,305,842) in the monitoring report, indicating a massive over-claim or significant VVB reduction
- 14 material findings in the validation report, including fundamental dry-vs-wet-basis calculation errors for biomass, missing fossil fuel consumption data, and a non-conservative grid emission factor
- Grid emission factor of 0.90973 tCO2/MWh is from 2008, over a decade before the monitoring period began in 2013
- Leakage deduction of 0% justified only as 'deemed negligible' with a contradictory appendix suggesting quantification was attempted
- PDD (Dec 2012) post-dates the validation report (Jul 2012) and shows additionality_verified_by_vvb as false, contradicting the VVB's own assessment
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2022 | 1,301,655 | 0 | 1,301,655 | |
| Total | 1,301,655 | 0 | 1,301,655 |
Risk Indicators
VVB-confirmed but PDD contradiction
Avoidance project, no reversal risk
0% deduction, weak justification, contradiction
Project-specific, 2008 grid EF
Mentioned but FPIC and grievance not documented
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →