This 20 MW biomass power project in Odisha, India, is registered under the UCR domestic registry using the established ACM0018 methodology with a jurisdictional baseline. However, the available record consists solely of a Project Design Document; no verification report, monitoring report, or independent verification body identification was found, leaving the claimed 1.14 million tCO2e unverified and additionality unconfirmed. The project shows no material findings or corrective actions, but the absence of any third-party verification data significantly limits confidence in the credit claims.
Red Flags
- No independent verification body (VVB) is identified in the available record; the claimed 1,135,296 tCO2e has no corresponding verified figure to confirm or challenge
- Additionality test type and VVB confirmation are not stated in the PDD, leaving the core additionality claim undocumented
- Only a single document (the PDD dated 2022-12-30) is available; no verification report, monitoring report, or VVB audit report was found
- Grid emission factor of 0.9 tCO2/MWh is sourced from 2014 data, which is nearly a decade old at the time of the PDD
Credit Vintages
Issuance data not yet available — check back soon.
Risk Indicators
Test type and VVB confirmation not stated in PDD
No buffer pool; low inherent risk for power generation
0% deemed negligible; reasonable for grid-displacement proje
Jurisdictional method stated; grid EF from 2014; no reassess
Safeguards mentioned; FPIC and grievance mechanism not docum
CORSIA and CCP status not stated in available record
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →