Guangxi Fusui Qiquan biomass power generation project
#46of 196 in Biomass#103of 204 in China#349of 629 in Verra (VCS)#3of 6 in ACM0018
Audit Analysis
A VCS biomass power generation project in China with VVB-confirmed additionality and a named certification body, but undermined by three material findings (including a 64% shortfall in verified reductions versus the project design estimate), nine corrective actions, a contradictory baseline method description, and a weakly justified zero leakage deduction. The project delivered roughly 72% of its pro-rata expectation for the elapsed monitoring period, and several operational details (carbon content testing, feedstock sustainability, LCA) are absent from the record.
Red Flags
- Three material findings in the 2021 verification report: diesel fuel monitored via purchase invoices rather than a flow meter, verified reductions 64% below the project design estimate, and operating hours 36% below ex-ante assumptions
- Nine corrective actions (CAR 01–CAR 09) were required, indicating systemic compliance gaps in monitoring and reporting
- Leakage deduction of 0% is justified as 'deemed negligible' in the verification report, yet the validation report records leakage as 'not addressed' — an unresolved inconsistency
- Baseline method is described as 'project-specific' in the 2021 monitoring report but 'jurisdictional' in the 2019 monitoring report, creating ambiguity about the reference case
- Grid emission factor is from 2017, which is the most recent year available in the record but may not reflect current grid conditions for a project operating through 2048
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2018 | 538 | 538 | 0 | |
| 2019 | 37,107 | 23,108 | 13,999 | |
| 2020 | 50,388 | 31,405 | 18,983 | |
| 2021 | 11,722 | 11,722 | 0 | |
| Total | 99,755 | 66,773 | 32,982 |
Risk Indicators
VVB-confirmed combined test
Energy project, no buffer pool stated
0% deduction, justification contradicted
Project-specific, method contradictory across docs
Confirmed in VVB report, contradicted elsewhere
CORSIA excluded, CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →