Biomass generation project, in Sheyang county, Jiangsu province, P.R. China
#157of 352 in Biomass#816of 1084 in China#1079of 1459 in CDM (UNFCCC)#7of 13 in ACM0018
Audit Analysis
A CDM biomass energy project in Jiangsu, China, that was validated and monitored but exhibits significant data gaps in additionality documentation, baseline methodology, and feedstock sustainability. The project delivered only about 36% of its pro-rata expected emissions reductions for the elapsed monitoring period, and three material contradictions between the PDD, validation report, and monitoring report undermine confidence in the underlying claims.
Red Flags
- Verified emissions reductions (132,116 tCO2e) represent only ~36% of the pro-rata expectation (~362,000 tCO2e) for the 4.6-year monitoring period, indicating substantial under-delivery against the 550,479 tCO2e lifetime claim
- Baseline method is contradictory: the monitoring report (2022) states a project-specific baseline while the appendix (2016) references a jurisdictional baseline
- Additionality test type and VVB confirmation are not stated in any available document, leaving the core additionality claim unverifiable from the extracted record
- Leakage justification is contradictory: the PDD (2016) deems leakage negligible while the monitoring report (2022) states it was quantified, yet the deduction remains 0%
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2014 | 357,824 | 0 | 357,824 | |
| 2023 | 859,380 | 0 | 859,380 | |
| Total | 1,217,204 | 0 | 1,217,204 |
Risk Indicators
Test type and VVB confirmation not stated in available docum
mixed evidence / unresolved risk
0% deduction with contradictory justification (negligible vs
Method contradictory (project vs jurisdictional); reassessed
Safeguards and benefit sharing mentioned; FPIC and grievance
CORSIA and CCP status not stated; single CDM registry
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →