Projects add a biological methane-oxidation layer to a landfill with low residual methane emissions. The method measures methane consumed in the cover layer before it reaches the atmosphere.

Version
1.0 · source ·
Status
Active at CDM / UNFCCC · source ·
Climate outcome
Emission reductions
Activity
Waste
Official page
cdm.unfccc.int ·

How methodology v3 reads projects of this type

What CarbonMeld reads

  • A confirmed investment analysis A-INVEST

    The documents show a project-level additionality test, the validation confirmed it, and it is an investment analysis (a numeric test of the project's finances with and without carbon revenue).

  • A methane activity the law requires A-LEGAL

    The rule applies to projects that capture or avoid methane. These are landfill gas, manure, wastewater, composting and coal-mine methane. They also include orphan wells, oil and gas leaks, rice, enteric methane and household biogas. The documents state that the law requires the activity. Or the documents state that a law requires the capture of the gas. An activity that the law already requires is not additional. If the documents show that the baseline already deducts the amount that the law requires, CarbonMeld takes no point.

Figures set against the methodology's own values

  • Integrity comparison

    The small-scale limit is 60 kt CO2e per year (p. 1). CarbonMeld compares the project's annual estimate with it. CM-F-AMS-III-AX-SMALL-SCALE-LIMIT

    small-scale limit: 60 kt CO2e per year

    Link

Set by the methodology or the programme, not assessed by our current method

  • not assessed

    Social safeguards and consent of communities (FPIC): any such rules come from the programme, not the methodology. Our current method does not assess it. CM-F-AMS-III-AX-SAFEGUARDS-FPIC

    Link

Not applicable to this type — never a gap in our current method

The criterion does not apply to this methodology. Our current method never counts it as a gap.

The general rules apply as well. Read the general rules.

The rules of methodology v2.2, as they were: the archived v2.2 page.

Projects using AMS-III.AX

Browse 1 published project using AMS-III.AX, listed alphabetically. There is no ranking for this methodology yet: it appears here automatically once 5 of its projects not in the pipeline or under validation are rated. Open a project to view its registry details and the analysis available for that project.

Which registries list projects under AMS-III.AX?

In CarbonMeld's data, AMS-III.AX projects are on one registry: CDM (1 project, 0 registered).

RegistryProjectsRegisteredProjects list
CDM (UNFCCC)10See the list

Counts of project records in CarbonMeld's data, with or without a CarbonMeld analysis. «Registered» counts the records whose current registry status is «registered», as last read (20 November 2026); projects in a later status, such as awaiting verification approval, late to verify or completed, are not in that column.