Grid emission factor: the methodology sets rules for it in some cases. CarbonMeld reads it in the project's documents. CM-F-ACM0015-GRID-EF
ACM0015 — Emission reductions from raw material switch in clinker production
About this methodology
Projects replace carbonate-containing raw materials in cement clinker production with alternative materials, sometimes alongside energy efficiency measures. The method measures changes in process emissions and energy use for clinker production.
- Issued by
- CDM (UNFCCC) · issuer's site
- Version
- 4.0 · source ·
- Status
- Active at CDM / UNFCCC · source ·
- Climate outcome
- Emission reductions
- Activity
- Cement and lime
- Official page
- cdm.unfccc.int ·
How methodology v3 reads projects of this type
What CarbonMeld reads
- shown
- shown
Leakage: the methodology sets rules for it (ACM0015 v04.0 Leakage para 78, p. 28). CarbonMeld reads it in the project's documents. CM-F-ACM0015-LEAKAGE
A confirmed investment analysis A-INVEST
The documents show a project-level additionality test, the validation confirmed it, and it is an investment analysis (a numeric test of the project's finances with and without carbon revenue).
Set by the methodology or the programme, not assessed by our current method
- not assessed
No legal requirement for the activity: the methodology sets rules for it. Our current method does not assess it. CM-F-ACM0015-REGULATORY-SURPLUS
- not assessed
Sustainability of the feedstock: the methodology sets rules for it in some cases (ACM0015 v04.0 applicability 4, p. 5). Our current method does not assess it. CM-F-ACM0015-FEEDSTOCK-SUSTAINABILITY
- not assessed
Social safeguards and consent of communities (FPIC): any such rules come from the programme, not the methodology. Our current method does not assess it. CM-F-ACM0015-SAFEGUARDS-FPIC
Not applicable to this type — never a gap in our current method
The criterion does not apply to this methodology. Our current method never counts it as a gap.
- CM-N-BUFFERBuffer pool
- CM-N-PERMANENCE-REVERSALPermanence and reversals
- CM-N-FNRBFraction of non-renewable biomass (fNRB)
- CM-N-USAGEUsage rate of the devices
- CM-N-DURABILITY-MEASUREMENTDurability of the storage
- CM-N-END-USE-TRACKINGTracking of the end use
The general rules apply as well. Read the general rules.
The rules of methodology v2.2, as they were: the archived v2.2 page.
History and transitions
All 4 versions
-
v04.0adopted 1 Jun 2014source
(i) expands the applicability of the methodology to Greenfield cement plants; (ii) and changes the title from “Consolidated baseline and monitoring methodology for project activities using alternative raw materials that do not contain …
-
v03adopted 26 Mar 2010 – 31 May 2014source
Restricts the application of the methodology to existing plants only, modifies equations (4) and (13) in order to correct the units of the involved parameters and changes the definitions of some parameters in order to make their …
-
v02adopted 25 Mar 2009 – 25 Mar 2010source
Changes in procedure to assign value to SKCy in equation 12, providing simpler and conservative approach; replaces the word ‘manufacturing’ by ‘production’; and applies other editorial changes.
-
v01adopted 30 Nov 2007 – 7 Apr 2009source
Initial adoption.
Projects using ACM0015
Browse 11 published projects using ACM0015, listed alphabetically. There is no ranking for this methodology yet: it appears here automatically once 5 of its projects not in the pipeline or under validation are rated. Open a project to view its registry details and the analysis available for that project.
Which registries list projects under ACM0015?
In CarbonMeld's data, ACM0015 projects are on one registry: CDM (11 projects, 0 registered).
| Registry | Projects | Registered | Projects list |
|---|---|---|---|
| CDM (UNFCCC) | 11 | 0 | See the list |
Counts of project records in CarbonMeld's data, with or without a CarbonMeld analysis. «Registered» counts the records whose current registry status is «registered», as last read (20 November 2026); projects in a later status, such as awaiting verification approval, late to verify or completed, are not in that column.
- Analysis: No rating yet
- Analysis: No rating yet
- Analysis: No rating yet
- Analysis: No rating yet
- Analysis: No rating yet
- Analysis: Not registered
- Analysis: No rating yet
- Analysis: No rating yet
- Analysis: No rating yet
- Analysis: No rating yet
- Analysis: Not registered
