Skip to main content
CarbonMeld CarbonMeld Carbon Observatory

AM0040 — Baseline and monitoring methodology for project activities using alternative raw materials that contain carbonates in clinker manufacturing in cement kilns

About this methodology

Projects use alternative carbonate-containing raw materials in cement clinker production. The method measures changes in CO2 emissions from raw-material processing and energy consumption.

Last published version
1.1 · source ·
Status
Withdrawn at CDM / UNFCCC · source ·
Climate outcome
Emission reductions
Activity
Cement and lime
Official page
cdm.unfccc.int ·

How methodology v3 reads projects of this type

What CarbonMeld reads

  • shown

    Grid emission factor: the methodology sets rules for it in some cases. CarbonMeld reads it in the project's documents. CM-F-AM0040-GRID-EF

    Link
  • shown

    Leakage: the methodology sets rules for it (AM0040 v1.1 Leakage, p. 13). CarbonMeld reads it in the project's documents. CM-F-AM0040-LEAKAGE

    Link
  • A confirmed investment analysis A-INVEST

    The documents show a project-level additionality test, the validation confirmed it, and it is an investment analysis (a numeric test of the project's finances with and without carbon revenue).

Set by the methodology or the programme, not assessed by our current method

  • not assessed

    No legal requirement for the activity: the methodology sets rules for it. Our current method does not assess it. CM-F-AM0040-REGULATORY-SURPLUS

    Link
  • not assessed

    Sustainability of the feedstock: the methodology sets rules for it in some cases (AM0040 v1.1 applicability, p. 2). Our current method does not assess it. CM-F-AM0040-FEEDSTOCK-SUSTAINABILITY

    Link
  • not assessed

    Social safeguards and consent of communities (FPIC): any such rules come from the programme, not the methodology. Our current method does not assess it. CM-F-AM0040-SAFEGUARDS-FPIC

    Link

Not applicable to this type — never a gap in our current method

The criterion does not apply to this methodology. Our current method never counts it as a gap.

The general rules apply as well. Read the general rules.

The rules of methodology v2.2, as they were: the archived v2.2 page.

History and transitions

  • v1.1until 13 Dec 2007last publishedsource

Projects using AM0040

Browse 2 published projects using AM0040, listed alphabetically. There is no ranking for this methodology yet: it appears here automatically once 5 of its projects not in the pipeline or under validation are rated. Open a project to view its registry details and the analysis available for that project.

Which registries list projects under AM0040?

In CarbonMeld's data, AM0040 projects are on one registry: CDM (2 projects, 0 registered).

RegistryProjectsRegisteredProjects list
CDM (UNFCCC)20See the list

Counts of project records in CarbonMeld's data, with or without a CarbonMeld analysis. «Registered» counts the records whose current registry status is «registered», as last read (20 November 2026); projects in a later status, such as awaiting verification approval, late to verify or completed, are not in that column.

← All leaderboards · Full database