Skip to main content
CarbonMeld CarbonMeld Carbon Observatory

VM0038 — Electric Vehicle Charging Systems

About this methodology

Projects install charging systems that enable electric passenger and freight vehicles to replace fossil-fuel travel. The method measures the resulting emission reductions using electricity delivered through the charging infrastructure.

Version
1.1 · source ·
Status
Active at Verra / Verified Carbon Standard · source ·
Climate outcome
Emission reductions
Activity
Transport
Official page
verra.org ·

How methodology v3 reads projects of this type

What CarbonMeld reads

  • shown

    Grid emission factor: the methodology sets rules for it (VM0038 v1.0 project emissions, p. 16). CarbonMeld reads it in the project's documents. CM-F-VM0038-GRID-EF

    Link
  • A confirmed investment analysis A-INVEST

    The documents show a project-level additionality test, the validation confirmed it, and it is an investment analysis (a numeric test of the project's finances with and without carbon revenue).

Set by the methodology or the programme, not assessed by our current method

  • not assessed

    Usage rate of the devices: the methodology sets rules for it (VM0038 v1.0 monitoring — electricity dispensed, p. 28). Our current method does not assess it. CM-F-VM0038-USAGE

    Link
  • not assessed

    No legal requirement for the activity: the methodology sets rules for it (VM0038 v1.0 additionality Step 1, p. 12). Our current method does not assess it. CM-F-VM0038-REGULATORY-SURPLUS

    Link
  • not assessed

    Tracking of the end use: the methodology sets rules for it (VM0038 v1.0 net emission reductions, p. 19). Our current method does not assess it. CM-F-VM0038-END-USE-TRACKING

    Link
  • not assessed

    Social safeguards and consent of communities (FPIC): any such rules come from the programme, not the methodology. Our current method does not assess it. CM-F-VM0038-SAFEGUARDS-FPIC

    Link

Not applicable to this type — never a gap in our current method

The criterion does not apply to this methodology. Our current method never counts it as a gap.

The general rules apply as well. Read the general rules.

The rules of methodology v2.2, as they were: the archived v2.2 page.

History and transitions

  • v1.1active from 19 Aug 2026currentsource

    Addition of applicability condition with EV stock and sales share limit Incorporation of corrections and clarifications issued on 20 September 2023 Adoption of VCS tools VT0008 and VT0011 Simplification of quantification approach Enhanced …

  • v1.0active from 18 Sept 2018 – 31 Aug 2027source

    Initial version

Projects using VM0038

Browse 30 published projects using VM0038, listed alphabetically. There is no ranking for this methodology yet: it appears here automatically once 5 of its projects not in the pipeline or under validation are rated. Open a project to view its registry details and the analysis available for that project.

Which registries list projects under VM0038?

In CarbonMeld's data, VM0038 projects are on one registry: Verra (30 projects, 18 registered).

RegistryProjectsRegisteredProjects list
Verra (VCS)3018See the list

Counts of project records in CarbonMeld's data, with or without a CarbonMeld analysis. «Registered» counts the records whose current registry status is «registered», as last read (25 November 2026); projects in a later status, such as awaiting verification approval, late to verify or completed, are not in that column.

3 of these projects have no number: additionality, quantification or both have no public grade of their type of project that applies to them yet. Their pages give the reason and how many negative facts were found; the analysis is in Premium.

← All leaderboards · Full database