Top VM0038 projects
15 rated projects in this methodology · average score 5/10 · ranked by CarbonMeld's document-based assessment scores across all four dimensions: integrity, transparency, claim safety and documentation.
What you're looking at
This page ranks projects using VM0038 by their CarbonMeld document-based assessment scores. The rank compares project assessments; it is not a rating of the methodology itself.
CarbonMeld scores assess integrity, transparency, claim safety and documentation using project documents. Higher scores indicate stronger evidence under this framework. How to read CarbonMeld scores.
Project names, codes and registry status come from official registry records. Open a project dossier for its source record. Registry / standard: Verra / VCS .
VM0038: Electric Vehicle Charging Systems
Methodology issuer: Verra / Verified Carbon Standard · Official methodology page.
Transport · Emission reductions
Projects install charging systems that enable electric passenger and freight vehicles to replace fossil-fuel travel. The method measures the resulting emission reductions using electricity delivered through the charging infrastructure.
Version 1.1 · Active at Verra / Verified Carbon Standard · status verified on
Version and status refer to the methodology at its issuer. Individual projects may use different versions; these facts do not establish credit eligibility in other programs.
- 45.6▲+0.4
- 55.4▲+0.4
- 65.3▼-0.8
- 75.1▲+0.2
- 85.1▼-0.7
- 95.1▼-2.4
- 105▲+0.4
- 115▲+0.2
- 124.7▲+0.3
- 134.6▼-0.2
- 143.4▼-0.9
- 153.1▼-1.2
Rank is by document-based assessment score only. The registry status shown next to each project is a separate fact: inclusion in this ranking is not a statement of current validity or credit eligibility — projects suspended, withdrawn or terminated by their registry can still appear, with their status labelled. Read the methodology.
