Skip to main content
CarbonMeld CarbonMeld Carbon Observatory
Tools
EN
Re-assessment pendingVCSEnergy industries (renewable/non-renewable sources); TransportSouth KoreaRegistry: Issuance requestedVM0038

Electric Vehicle Charging Programme in Korea

Developer: Hyundai Engineering

VCS-5237 ↗

#7of 84 in South Korea#169of 1609 in Verra (VCS)#1of 15 in VM0038

Score from methodology v2.1 (analysis of 2 Sep 2026). Re-assessment under v2.2 pending.

Assessment

CarbonMeld document-based assessment

01020304 Overall 6.3 / 10 Dimension scores are locked — the faint arcs are empty tracks, not zero scores.

Scale 0–10 · method weights: integrity 35% · transparency 25% · claim safety 25% · documentation 15%.

Re-assessment pending · v2.1

Analysis

A VCS-registered EV charging project in South Korea with a VVB-confirmed combined additionality test, smart-meter monitoring, and no material findings. The project-specific baseline, absence of a stated buffer pool, and a notable discrepancy between the PDD's ex-ante ERR (26,460 t) and the monitoring report's calculated ERR (41,795 t) moderate confidence. Overall a reasonably sound avoidance project with some documentation gaps around eligibility and permanence provisions.

Red Flags

2 red flags detected — Unlock with Premium

Findings

Risk Indicators

Additionality

🔒

Permanence

🔒

Leakage

🔒

Baseline

🔒

Safeguards

🔒

Double-claim

🔒

Risk indicator details are a Premium feature

Score Breakdown

Score factors per dimension are a Premium feature — Unlock with Premium

Detailed Analysis

The detailed per-dimension analysis is a Premium feature — Unlock with Premium

Evidence

Unlock the full analysis

Per-dimension scores, risk indicators, 2 red flags, score factors, detailed analysis, and 12 registry documents (11 analyzed).

€9+ VAT · 30-day pass · one-time, no auto-renewal

Every rated project, PDF reports, API access, portfolio alerts and per-dimension scores with red-flag details in side-by-side comparisons for 30 days (public-data comparison is free; fair use: 30 projects per day).

Price + VAT · By paying you accept the Terms of Use — digital content, no refunds. How Premium works

Eligibility & market

What can you claim with this credit?

Four checks buyers ask about, from the registry and the Integrity Council (ICVCM).

  • Airlines (CORSIA)

    No CORSIA label on the registry

    Not usable for airlines' CORSIA obligations.

    Source: registry label

  • Integrity label (ICVCM CCP)

    No ICVCM information

    No CCP label and no ICVCM decision found for this project's methodology.

  • Removal or reduction

    Emission reduction or avoidance

    Prevents or reduces emissions — fits contribution claims, not SBTi neutralisation.

    Source: methodology

  • Paris Agreement (Article 6)

    No Article 6 authorization

    No corresponding adjustment: the host country can also count this reduction towards its own target.

    Source: registry label

Information only, from public sources. Claim rules (CORSIA, SBTi, EU rules on green claims) change: check them before making a public claim. Since 27 September 2026, EU consumer rules do not allow “climate neutral” product claims based on offsets.

Registry labels last checked:2026-10-11

Credit Vintages

IssuedRetiredAvailable
2023
3,8001003,700
2024
1,30001,300
Total5,1001005,000

Methodology versions used

The methodology version stated in each monitoring, verification and issuance document, by period, compared with the official methodology pages.

  1. 2023–2024VM0038 v1.0since replaced by v1.1

    verification report

    official page · verified on

  • VM0038: Active (Verra / Verified Carbon Standard) · official page · verified on

A version is shown only when the document's own text writes it next to the methodology code. Current versions, status and CCP ranges come from the official pages linked, checked on the date shown.

Documents on the registry

Where to buy

Got an offer for these credits? Check it against the registry →

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

Profile & governance

Analysis ProvenanceVM0038

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected] →

Contest this rating

Something wrong in the analysis, or a registry document we have not used? Send us the link to the public source: you get a reference and an answer within 30 days.

Contest this rating →