Skip to main content
VCSTransportUnited States Registry: RegisteredVM0038

Electrify America - EV Charging Network Carbon Credits

VCS-1929 ↗

#7of 115 in United States#253of 629 in Verra (VCS)#2of 8 in VM0038

5.6/ 10
Integrity
5.5
Transparency
5.5
Claim Safety
5.5
Documentation
6.5

Audit Analysis

Electrify America's EV charging project has a VVB-confirmed additionality assessment and a reasonable 0% leakage deduction, but suffers from a project-specific baseline, no stated buffer pool, and a significant gap between the PDD's lifetime estimate (95,455 tCO₂e) and the verified 2-year figure (2,396 tCO₂e), representing only ~12.5% of the pro-rata expectation. Five minor material findings were identified and corrective actions required, but none are substantive. Overall a mid-tier project with solid verification but notable data gaps.

Red Flags

  • PDD lifetime estimate of 95,455 tCO₂e implies ~19,091 tCO₂e for the 2-year monitoring period, yet only 4,277 tCO₂e was claimed and 2,396 tCO₂e verified — a 77.6% shortfall against pro-rata expectation, suggesting the PDD assumptions were significantly over-optimistic
  • No buffer pool percentage is stated in any available document, leaving permanence risk unquantified despite the project relying on continued operation of charging infrastructure
  • Grid emission factor is not stated in any extracted document, which is a critical input for a grid-based avoidance project
  • CORSIA eligibility and CCP status are both unstated, leaving dual-channel risk unassessed

Credit Vintages Exhausted

IssuedRetiredAvailable
2019
5615610
2020
1,8351,8350
Total2,3962,3960

Risk Indicators

Additionality

VVB-confirmed combined test

Permanence

Avoidance project, no buffer pool stated

Leakage

0% deduction, quantified justification

Baseline

Project-specific, no reassessment date

Safeguards

FPIC, grievance mechanism, benefit sharing documented

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-25VM0038

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents