Skip to main content
VCSEnergy industries (renewable/non-renewable sources); TransportUnited States Registry: RegisteredVM0038

CSG EV Charger Premier Aggregation

VCS-4029 ↗

#29of 115 in United States#491of 629 in Verra (VCS)#5of 8 in VM0038

4.6/ 10
Integrity
5.0
Transparency
4.5
Claim Safety
4.5
Documentation
4.0

Audit Analysis

The CSG EV Charger Premier Aggregation project is a registered VCS renewable-energy project with VVB-confirmed additionality, but it carries notable baseline uncertainty due to a grid emission factor contradiction (0 in the PDD versus 0.0088 in an appendix), a thin leakage justification, and two material findings at validation requiring PD revision. Safeguards documentation is weak, with no FPIC, no grievance mechanism per the validation report, and no benefit-sharing description confirmed by the VVB.

Red Flags

  • Grid emission factor contradiction: the PDD states 0 while an appendix states 0.0088, creating uncertainty about the baseline calculation for avoided emissions
  • Two material findings at validation required revision of the project design to meet VCS Standard and VM0038 requirements, including additional REC criteria detail for the methodology deviation
  • No buffer pool percentage is stated in any available document, leaving no quantified safety margin against potential over-crediting
  • Safeguards are weakly documented: FPIC not conducted, grievance mechanism absent per the validation report, and benefit sharing not confirmed by the VVB

Credit Vintages

No issuances recorded on the registry.

Risk Indicators

Additionality

VVB-confirmed combined test

Permanence

No buffer pool stated; energy project (lower risk)

Leakage

0% deduction, 'deemed negligible' only

Baseline

Project-specific; grid EF contradiction

Safeguards

No FPIC, no grievance mechanism, no benefit sharing per VVB

Double-claim

CORSIA not eligible; CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-24VM0038

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents