Vemo Conduce - Mexico City
#15of 47 in Mexico#687of 1339 in Verra (VCS)#9of 15 in VM0038
Audit Analysis
Vemo Conduce is a VCS-registered EV charging infrastructure project in Mexico City verified by TÜV SÜD, with no material findings or corrective actions. However, the project delivered only about 14% of its pro-rata expected emissions reductions for the 2022–2023 monitoring period, the additionality rests on the weakest VCS test (common practice), and seven inter-document contradictions—including a direct conflict on FPIC status—undermine confidence in the data record.
Red Flags
- Verified ERR of 9,195 tCO₂e for the 2022–2023 monitoring period is only ~14% of the pro-rata expectation (~64,700 tCO₂e) derived from the PDD's lifetime estimate of 334,030 tCO₂e over the ~10.3-year crediting period, suggesting the ex-ante baseline may have been significantly over-estimated.
- FPIC status is directly contradicted: the verification report (Aug 2025) states FPIC was conducted, while the monitoring report (Jun 2024) states it was not. This is a material safeguards discrepancy.
- Leakage is set at 0% with a 'deemed negligible' justification in the verification report, yet the PDD originally quantified leakage at 0.75%, indicating a shift in approach without clear methodological grounding.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2022 | 1,802 | 0 | 1,802 | |
| 2023 | 7,393 | 0 | 7,393 | |
| Total | 9,195 | 0 | 9,195 |
Risk Indicators
VVB-verified but weakest test (common practice)
no reversal events recorded
0% deduction, 'deemed negligible' justification; PDD origina
Project-specific baseline; reassessment not yet due under VC
FPIC contradicted between documents; grievance mechanism pre
CORSIA and CCP status not stated in available documents
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →