EZVOLT - EV CHARGING NETWORK CARBON CREDITS PROJECT
#55of 104 in Brazil#437of 629 in Verra (VCS)#3of 8 in VM0038
Audit Analysis
The EZVOLT EV charging project in Brazil has a verified additionality assessment and appropriate safeguards, but is undermined by a severe discrepancy between the PDD's lifetime emissions estimate (387,161 tCO₂e) and the validation report's figure (1,835 tCO₂e), a large grid emission factor inconsistency, and the absence of a stated buffer pool. The project's avoidance-based design (no carbon stock) limits permanence risk, yet the data contradictions raise material questions about the reliability of the underlying quantification.
Red Flags
- The PDD (Feb 2024) reports a lifetime ERR of 387,161 tCO₂e while the validation report (Mar 2025) reports only 1,835 tCO₂e — a 99.5% reduction that is unexplained in the extracted record and raises serious over-crediting or scope-change concerns.
- The grid emission factor differs by a factor of roughly 5,500 between the PDD (3.85 × 10⁻⁵) and the validation report (0.2126), with no unit clarification or reconciliation in the available documents.
- No buffer pool percentage is stated in any extracted document, leaving the permanence safeguard for this VCS project unquantified.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2022 | 35 | 0 | 35 | |
| 2023 | 983 | 0 | 983 | |
| 2024 | 817 | 0 | 817 | |
| Total | 1,835 | 0 | 1,835 |
Risk Indicators
VVB-confirmed barrier test
Avoidance project, no buffer pool stated
0% deduction, 'deemed negligible' only
Project-specific, no reassessment date
FPIC, grievance mechanism, safeguards documented
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →