RBML (Reliance BP Mobility Limited) EV Charging Infrastructure Project

VCS-4982 ↗

#529of 975 in India#669of 1339 in Verra (VCS)#8of 15 in VM0038

5.1/ 10
Integrity
6.0
Transparency
4.5
Claim Safety
3.5
Documentation
6.5

Audit Analysis

The RBML EV charging project has a confirmed additionality assessment and no material findings, but the verified emissions reductions (2,888 tCO₂e over ~2 years) represent only about 0.6% of the pro-rata expectation derived from the lifetime ex-ante estimate of 2.29 million tCO₂e, raising serious over-crediting concerns. Contradictions in the PDD versions regarding ERR figures, grid emission factors, and leakage treatment further undermine confidence in the project's quantitative claims.

Red Flags

  • Verified ERR of 2,888 tCO₂e over a ~2-year monitoring period is only ~0.6% of the pro-rata expectation (~458,207 tCO₂e) derived from the 2.29 million tCO₂e lifetime estimate — a 99.4% shortfall that suggests the ex-ante estimate was wildly optimistic or the project is severely underperforming
  • The PDD was revised between May 2024 and February 2025, reducing the lifetime ERR estimate from 10.68 million to 2.29 million tCO₂e and the grid emission factor from 0.931 to 0.727, indicating a major re-scoping of the project design
  • Leakage treatment is contradictory: the monitoring report (March 2024) states leakage was quantified, while the validation report (February 2025) states it was not addressed, yet the deduction is 0%

Credit Vintages

IssuedRetiredAvailable
2022
1350135
2023
1,52001,520
2024
1,23301,233
Total2,88802,888

Risk Indicators

Additionality

VVB-confirmed combined test

Permanence

Avoidance project, no reversal risk

Leakage

0% deduction, contradictory justification

Baseline

Project-specific, reassessment not yet due

Safeguards

FPIC and grievance mechanism documented

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-03VM0038

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents