Grid emission factor: the methodology sets rules for it in some cases. CarbonMeld reads it in the project's documents. CM-F-AMS-III-AS-GRID-EF
AMS-III.AS — Switch from fossil fuel to biomass in existing manufacturing facilities for non-energy applications
About this methodology
Projects replace all or part of fossil-fuel use in manufacturing with renewable biomass. The method measures the emission reductions from that fuel switch.
- Issued by
- CDM (UNFCCC) · issuer's site
- Version
- 2.0 · source ·
- Status
- Active at CDM / UNFCCC · source ·
- Climate outcome
- Emission reductions
- Activity
- Industrial energy
- Official page
- cdm.unfccc.int ·
- Also used by projects of
- Gold Standard (GS) (3 projects)
- Verra (VCS) (2 projects)
How methodology v3 reads projects of this type
What CarbonMeld reads
- shown
- shown
Leakage: the methodology sets rules for it in some cases (AMS-III.AS v02 para 32, p. 10). CarbonMeld reads it in the project's documents. CM-F-AMS-III-AS-LEAKAGE
A confirmed investment analysis A-INVEST
The documents show a project-level additionality test, the validation confirmed it, and it is an investment analysis (a numeric test of the project's finances with and without carbon revenue).
Set by the methodology or the programme, not assessed by our current method
- not assessed
Sustainability of the feedstock: the methodology sets rules for it. Our current method does not assess it. CM-F-AMS-III-AS-FEEDSTOCK-SUSTAINABILITY
- not assessed
Social safeguards and consent of communities (FPIC): any such rules come from the programme, not the methodology. Our current method does not assess it. CM-F-AMS-III-AS-SAFEGUARDS-FPIC
Not applicable to this type — never a gap in our current method
The criterion does not apply to this methodology. Our current method never counts it as a gap.
- CM-N-BUFFERBuffer pool
- CM-N-PERMANENCE-REVERSALPermanence and reversals
- CM-N-FNRBFraction of non-renewable biomass (fNRB)
- CM-N-USAGEUsage rate of the devices
- CM-N-REGULATORY-SURPLUSNo legal requirement for the activity
- CM-N-DURABILITY-MEASUREMENTDurability of the storage
- CM-N-END-USE-TRACKINGTracking of the end use
The general rules apply as well. Read the general rules.
The rules of methodology v2.2, as they were: the archived v2.2 page.
History and transitions
-
v02.0adopted 28 Nov 2014source
Introduces the methodological tool “Project emissions from cultivation of biomass”, streamlining biomass cultivation procedures across small and large scale methodologies; Streamlines upstream leakage emissions associated with fossil fuel …
-
v01.0adopted 18 Feb 2011source
Initial adoption.
Projects using AMS-III.AS
Browse 10 published projects using AMS-III.AS, listed alphabetically. There is no ranking for this methodology yet: it appears here automatically once 5 of its projects not in the pipeline or under validation are rated. Open a project to view its registry details and the analysis available for that project.
Which registries list projects under AMS-III.AS?
In CarbonMeld's data, AMS-III.AS projects are on 3 registries: CDM (5), Gold Standard (3) and Verra (2). Being listed on a registry is not the same as being registered: the «Registered» column counts the projects each registry shows as registered, and credits are issued only after each verification.
| Registry | Projects | Registered | Projects list |
|---|---|---|---|
| CDM (UNFCCC) | 5 | 5 | See the list |
| Gold Standard (GS) | 3 | 3 | See the list |
| Verra (VCS) | 2 | 0 | See the list |
Counts of project records in CarbonMeld's data, with or without a CarbonMeld analysis. «Registered» counts the records whose current registry status is «registered», as last read (15 November 2026); projects in a later status, such as awaiting verification approval, late to verify or completed, are not in that column.
One of these projects has no number: additionality, quantification or both have no public grade of its type of project that applies to it yet. Its page shows the analysis.
- Analysis: No rating yet
- Analysis: No public grade applies yet
- Analysis: Re-assessment pending
- Analysis: Re-assessment pending
- Analysis: Re-assessment pending
- Analysis: No rating yet
- Analysis: No rating yet
- Analysis: No rating yet
- Analysis: No rating yet
- Analysis: No rating yet