Skip to main content
CarbonMeld CarbonMeld Carbon Observatory

AMS-I.K — Solar cookers for households

About this methodology

Projects provide solar cookers to households to replace fossil fuels or non-renewable biomass used for cooking. The method measures the emissions avoided through the use of the solar cookers.

Version
1.0 · source ·
Status
Active at CDM / UNFCCC · source ·
Climate outcome
Emission reductions
Activity
Household energy
Official page
cdm.unfccc.int ·
Also used by projects of

How methodology v3 reads projects of this type

What CarbonMeld reads

  • shown

    Fraction of non-renewable biomass (fNRB): the methodology sets rules for it in some cases (AMS-I.K v01 para 6, p. 1). CarbonMeld reads it in the project's documents. CM-F-AMS-I-K-FNRB

    Link
  • A confirmed investment analysis A-INVEST

    The documents show a project-level additionality test, the validation confirmed it, and it is an investment analysis (a numeric test of the project's finances with and without carbon revenue).

  • No usage monitoring (cookstoves, biogas, water treatment) Q-NO-USAGE-MONITORING

    Cookstoves, biogas and water treatment: the monitoring or verification reports that CarbonMeld read give no usage rate. For biogas and water treatment, the rule applies where the methodology asks for a usage survey or an operation survey. Where CarbonMeld read no monitoring or verification report, the rule does not apply. A usage check by the verifier counts as usage monitoring. Operation logs and the share of units still in operation count too. CarbonMeld applies this rule only where a check of the documents has confirmed its condition; without that check, the rule takes no points.

Figures set against the methodology's own values

  • fNRB above the official value, or an older default Q-FNRB-ABOVE

    CarbonMeld compares the fraction of non-renewable biomass (fNRB) with the official national value of the country. The rule applies to any project whose documents give an fNRB that CarbonMeld can compare with the official value. A project gets one fNRB deduction at most. Three sources of values get no deduction: TOOL33 version 03.0, A6.4-AMT-009, and a MoFuSS assessment whose stated year is 2024 or later.

    Above the official national value plus its 30% uncertainty.

Deductions that can apply

  • fNRB above the official value, or an older default Q-FNRB-OLD-DEFAULT

    CarbonMeld compares the fraction of non-renewable biomass (fNRB) with the official national value of the country. The rule applies to any project whose documents give an fNRB that CarbonMeld can compare with the official value. A project gets one fNRB deduction at most. Three sources of values get no deduction: TOOL33 version 03.0, A6.4-AMT-009, and a MoFuSS assessment whose stated year is 2024 or later.

    An older default value. This includes the TOOL33 values before version 03.0, the older national defaults and MoFuSS values whose stated year is before 2024. It also includes any other value that the documents give as a default. The CDM's fixed default of 0.3 is the exception. Only the two «above» cases can apply to it.

Set by the methodology or the programme, not assessed by our current method

  • not assessed

    Leakage: the methodology sets rules for it in some cases (AMS-I.K v01, p. 4). Our current method does not assess it. CM-F-AMS-I-K-LEAKAGE

    Link
  • not assessed

    Social safeguards and consent of communities (FPIC): any such rules come from the programme, not the methodology. Our current method does not assess it. CM-F-AMS-I-K-SAFEGUARDS-FPIC

    Link

Not applicable to this type — never a gap in our current method

The criterion does not apply to this methodology. Our current method never counts it as a gap.

The general rules apply as well. Read the general rules.

The rules of methodology v2.2, as they were: the archived v2.2 page.

Projects using AMS-I.K

Browse 1 published project using AMS-I.K, listed alphabetically. There is no ranking for this methodology yet: it appears here automatically once 5 of its projects not in the pipeline or under validation are rated. Open a project to view its registry details and the analysis available for that project.

Which registries list projects under AMS-I.K?

In CarbonMeld's data, AMS-I.K projects are on one registry: Gold Standard (1 project, 1 registered).

RegistryProjectsRegisteredProjects list
Gold Standard (GS)11See the list

Counts of project records in CarbonMeld's data, with or without a CarbonMeld analysis. «Registered» counts the records whose current registry status is «registered», as last read (20 November 2026); projects in a later status, such as awaiting verification approval, late to verify or completed, are not in that column.

← All leaderboards · Full database