Skip to main content
Rankings · methodology

Top AMS-I.I projects

78 rated projects in this methodology · average score 4.2/10 · ranked by CarbonMeld's document-based assessment scores across all four dimensions: integrity, transparency, claim safety and documentation. Showing the top 50 — filter the full table for the rest.

← All leaderboards · Full database

#1GS1239 Sichuan Rural Poor-Household Biogas Development Programme PoA- CPA Nb. SCHHBG-2012-003GSChinaBiogasRegistry: Registered5.5/10▲+0.3#2Sichuan Rural Poor-Household Biogas Development Programme, CPA Nb. SCHHBG-2010-01GSChinaBiomassRegistry: Registered5.4/10▼-1.3#3GS1239 Sichuan Rural Poor-Household Biogas Development Programme PoA- CPA Nb. SCHHBG-2012-032GSChinaBiogasRegistry: Registered5.3/10▲+3.6
  1. 45.2▲+0.4
  2. 55.2▲+1.1
  3. 65▲+0.5
  4. 75▲+3.9
  5. 85▲+0.5
  6. 95▲+3.5
  7. 105▼-0.2
  8. 115▲+0.1
  9. 125▲+0.3
  10. 134.8▲+0.9
  11. 144.8▲+1.0
  12. 154.8▲+0.1
  13. 164.8▲+0.2
  14. 174.8▲+0.1
  15. 184.6▼-0.5
  16. 194.6▲+3.1
  17. 204.6▼-0.4
  18. 214.6▲+0.3
  19. 224.6▼-0.4
  20. 234.5▼-0.6
  21. 244.5▼-0.5
  22. 254.5▲+3.0
  23. 264.5▲+0.5
  24. 274.5▲+2.1
  25. 284.5▼-0.5
  26. 294.5▼-0.5
  27. 304.4▼-0.4
  28. 314.4▲+0.2
  29. 324.3▲+0.2
  30. 334.3▲+0.5
  31. 344.3▼-0.7
  32. 354.2▲+2.7
  33. 364.2▼-0.9
  34. 374.2▲+2.9
  35. 384.2▼-0.6
  36. 394.2▼-1.2
  37. 404.1▼-0.7
  38. 414.1▲+2.4
  39. 424.1▼-1.0
  40. 434.1▼-1.6
  41. 444▼-0.5
  42. 454▼-0.8
  43. 464▲+2.7
  44. 474▼-0.5
  45. 484▼-0.6
  46. 494▼-0.7
  47. 504▼-0.9

Rank is by document-based assessment score only. The registry status shown next to each project is a separate fact: inclusion in this ranking is not a statement of current validity or credit eligibility — projects suspended, withdrawn or terminated by their registry can still appear, with their status labelled. Read the methodology.