Skip to main content
GSBiogas - HeatChinaAMS-I.I

Sichuan Rural Poor-Household Biogas Development Programme (GS1239 CER to VER conversion)

GS-1706 ↗ · current registry ID: GS7049

#213of 268 in Biogas#1000of 1084 in China#1581of 1801 in Gold Standard (GS)

4.1/ 10
Integrity
3.5
Transparency
5.0
Claim Safety
4.0
Documentation
4.5

Audit Analysis

This Gold Standard biogas project in rural Sichuan has confirmed additionality and a recent baseline reassessment, but is severely undermined by 27 material findings in the monitoring report—including incorrect calculation processes for baseline and project emissions—and a contradictory 0% leakage treatment. The volume of calculation errors and the absence of a stated buffer pool or lifetime ERR estimate create significant over-crediting and data-reliability concerns that limit confidence in the verified figures.

Red Flags

  • 27 material findings in the monitoring report, including incorrect baseline emission calculation, incorrect project emission calculation, and incorrect ER results (CAR 10–13), indicating fundamental MRV calculation errors
  • Contradictory leakage treatment: the verification report (Oct 2019) states leakage was 'quantified' while the monitoring report (Oct 2019) states it was 'deemed negligible,' yet the deduction is 0%—no clear methodology is documented
  • No buffer pool percentage is stated in any available document for a biogas project with inherent permanence risk, and no reversal events data is available
  • Four contradictions between documents on additionality test type, baseline method (modeled vs measured), and crediting period end date, reducing confidence in the project's documented parameters

Credit Vintages

IssuedRetiredAvailable
2013
16,98316,9830
2014
104,520103,614906
2016
101,26366,72234,541
2017
53,61028,46625,144
2018
93,84557,00036,845
2019
289,509197,25392,256
Total659,730470,038189,692

Risk Indicators

Additionality

VVB-confirmed combined test

Permanence

mixed evidence / unresolved risk

Leakage

0% deduction, contradictory justification

Baseline

Project-specific, modeled, reassessed 2021

Safeguards

Grievance & benefit sharing present, FPIC not stated

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-06AMS-I.I., AMS-III.R.

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents