AMS-III.BI — Flare gas recovery in gas treating facilities
About this methodology
Projects recover otherwise-flared gas for sale after treatment; the method measures emissions avoided through its useful replacement of other supplies.
- Issued by
- CDM (UNFCCC) · issuer's site
- Version
- 1.0 · source ·
- Status
- Active at CDM / UNFCCC · source ·
- Climate outcome
- Emission reductions
- Activity
- Gas processing
- Official page
- cdm.unfccc.int ·
How methodology v3 reads projects of this type
What CarbonMeld reads
- shown
A confirmed investment analysis A-INVEST
The documents show a project-level additionality test, the validation confirmed it, and it is an investment analysis (a numeric test of the project's finances with and without carbon revenue).
Figures set against the methodology's own values
- Integrity comparison
The small-scale limit is 60 kt CO2e per year (p. 3). CarbonMeld compares the project's annual estimate with it. CM-F-AMS-III-BI-SMALL-SCALE-LIMIT
small-scale limit: 60 kt CO2e per year
Set by the methodology or the programme, not assessed by our current method
- not assessed
Social safeguards and consent of communities (FPIC): any such rules come from the programme, not the methodology. Our current method does not assess it. CM-F-AMS-III-BI-SAFEGUARDS-FPIC
A methane activity the law requires A-LEGAL
The rule applies to projects that capture or avoid methane. These are landfill gas, manure, wastewater, composting and coal-mine methane. They also include orphan wells, oil and gas leaks, rice, enteric methane and household biogas. The documents state that the law requires the activity. Or the documents state that a law requires the capture of the gas. An activity that the law already requires is not additional. If the documents show that the baseline already deducts the amount that the law requires, CarbonMeld takes no point.
Not applicable to this type — never a gap in our current method
The criterion does not apply to this methodology. Our current method never counts it as a gap.
- CM-N-LEAKAGELeakage
- CM-N-BUFFERBuffer pool
- CM-N-PERMANENCE-REVERSALPermanence and reversals
- CM-N-FNRBFraction of non-renewable biomass (fNRB)
- CM-N-USAGEUsage rate of the devices
- CM-N-DURABILITY-MEASUREMENTDurability of the storage
- CM-N-FEEDSTOCK-SUSTAINABILITYSustainability of the feedstock
- CM-N-END-USE-TRACKINGTracking of the end use
The general rules apply as well. Read the general rules.
The rules of methodology v2.2, as they were: the archived v2.2 page.
Projects using AMS-III.BI
Browse 1 published project using AMS-III.BI, listed alphabetically. There is no ranking for this methodology yet: it appears here automatically once 5 of its projects not in the pipeline or under validation are rated. Open a project to view its registry details and the analysis available for that project.
Which registries list projects under AMS-III.BI?
In CarbonMeld's data, AMS-III.BI projects are on one registry: CDM (1 project, 1 registered).
| Registry | Projects | Registered | Projects list |
|---|---|---|---|
| CDM (UNFCCC) | 1 | 1 | See the list |
Counts of project records in CarbonMeld's data, with or without a CarbonMeld analysis. «Registered» counts the records whose current registry status is «registered», as last read (15 November 2026); projects in a later status, such as awaiting verification approval, late to verify or completed, are not in that column.
- Analysis: Re-assessment pending