Flare Gas Recovery in Sarkhoon and Qeshm Gas Treating Company
#5of 5 in Iran#1393of 1459 in CDM (UNFCCC)#53of 72 in AMS-II.I
Audit Analysis
A CDM flare-gas recovery project in Iran with a confirmed investment-test additionality assessment by SGS UK, but the available record contains only the 2015 validation report and no verification or monitoring data. Seven corrective action requests were raised during validation, and the leakage treatment is contradictory between the PDD and the validation report. The absence of any post-validation evidence makes it impossible to confirm that the 482,600 tCO₂e claim is being delivered.
Red Flags
- Seven Corrective Action Requests (CARs) were raised during validation, indicating material issues identified by the VVB that required project-side remediation
- Leakage justification is contradictory: the PDD (Aug 2015) states leakage was 'deemed negligible' while the validation report (Aug 2015) records it as 'not addressed', and the deduction is 0%
- No verification or monitoring reports are present in the extracted record; the 482,600 tCO₂e lifetime claim has no verified counterpart
- Minimum extraction confidence is rated low, meaning at least one key document was poorly readable and critical data may be missing
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
VVB-confirmed investment test
mixed evidence / unresolved risk
0% deduction, contradictory justification
Project-specific, measured, no reassessment data
Mentioned but no FPIC or grievance detail
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →