Additionality: the methodology itself gives it (ACR OOG v1.0 section 3.2.2, p. 18). The project needs no test of its own. CM-F-ACR-ORPHAN-WELLS-ADDITIONALITY
ACR-ORPHAN-WELLS — Plugging Orphaned Oil and Gas Wells
About this methodology
Projects plug orphaned oil and gas wells in the United States and Canada. The methodology accounts for the reduction in methane emissions from the plugged wells.
- Issued by
- American Carbon Registry (ACR) · issuer's site
- Last published version
- 1.0 · source ·
- Status
- Inactive at ACR · source ·
- Climate outcome
- Emission reductions
- Activity
- Oil and gas
- Official page
- acrcarbon.org ·
How methodology v3 reads projects of this type
What CarbonMeld reads
- Integrity shown
- reading
CarbonMeld reads a monitoring period of up to one year as the plugging of the wells. The methodology credits 20 years at once. CM-F-ACR-ORPHAN-WELLS-PLUGGING
Set by the methodology or the programme, not assessed by our current method
- not assessed
Permanence and reversals: the methodology sets rules for it in some cases (ACR OOG v1.0 section 4.7, p. 29). Our current method does not assess it. CM-F-ACR-ORPHAN-WELLS-PERMANENCE-REVERSAL
- not assessed
Durability of the storage: the methodology sets rules for it. Our current method does not assess it. CM-F-ACR-ORPHAN-WELLS-DURABILITY-MEASUREMENT
- not assessed
Social safeguards and consent of communities (FPIC): any such rules come from the programme, not the methodology. Our current method does not assess it. CM-F-ACR-ORPHAN-WELLS-SAFEGUARDS-FPIC
A methane activity the law requires A-LEGAL
The rule applies to projects that capture or avoid methane. These are landfill gas, manure, wastewater, composting and coal-mine methane. They also include orphan wells, oil and gas leaks, rice, enteric methane and household biogas. The documents state that the law requires the activity. Or the documents state that a law requires the capture of the gas. An activity that the law already requires is not additional. If the documents show that the baseline already deducts the amount that the law requires, CarbonMeld takes no point.
Not applicable to this type — never a gap in our current method
The criterion does not apply to this methodology. Our current method never counts it as a gap.
- CM-N-GRID-EFGrid emission factor
- CM-N-LEAKAGELeakage
- CM-N-BUFFERBuffer pool
- CM-N-FNRBFraction of non-renewable biomass (fNRB)
- CM-N-USAGEUsage rate of the devices
- CM-N-FEEDSTOCK-SUSTAINABILITYSustainability of the feedstock
- CM-N-END-USE-TRACKINGTracking of the end use
The general rules apply as well. Read the general rules.
The rules of methodology v2.2, as they were: the archived v2.2 page.
Projects using ACR-ORPHAN-WELLS
Browse 23 published projects using ACR-ORPHAN-WELLS, listed alphabetically. There is no ranking for this methodology yet: it appears here automatically once 5 of its projects not in the pipeline or under validation are rated. Open a project to view its registry details and the analysis available for that project.
Which registries list projects under ACR-ORPHAN-WELLS?
In CarbonMeld's data, ACR-ORPHAN-WELLS projects are on one registry: American Carbon Registry (23 projects, 11 registered).
| Registry | Projects | Registered | Projects list |
|---|---|---|---|
| American Carbon Registry (ACR) | 23 | 11 | See the list |
Counts of project records in CarbonMeld's data, with or without a CarbonMeld analysis. «Registered» counts the records whose current registry status is «registered», as last read (20 November 2026); projects in a later status, such as awaiting verification approval, late to verify or completed, are not in that column.
10 of these projects have no number: additionality, quantification or both have no public grade of their type of project that applies to them yet. Their pages show the analysis.
- Analysis: Too early to rate
- Analysis: No public grade applies yet
- Analysis: Too early to rate
- Analysis: No public grade applies yet
- Analysis: No public grade applies yet
- Analysis: Too early to rate
- Analysis: No public grade applies yet
- Analysis: No public grade applies yet
- Analysis: No public grade applies yet
- Analysis: Not yet assessable
- Analysis: Too early to rate
- Analysis: Too early to rate
- Analysis: No public grade applies yet
- Analysis: No rating yet
- Analysis: No rating yet
- Analysis: Too early to rate
- Analysis: Too early to rate
- Analysis: Re-assessment pending
- Analysis: No public grade applies yet
- Analysis: No public grade applies yet
- Analysis: Too early to rate
- Analysis: No public grade applies yet
- Analysis: Too early to rate
