Grid emission factor: the methodology sets rules for it in some cases. CarbonMeld reads it in the project's documents. CM-F-AM0062-GRID-EF
AM0062 — Energy efficiency improvements of a power plant through retrofitting turbines
About this methodology
Projects retrofit turbines in existing fossil-fuel power plants with more efficient components. The method measures emissions saved by generating electricity with less fuel.
- Issued by
- CDM (UNFCCC) · issuer's site
- Version
- 2.0 · source ·
- Status
- Active at CDM / UNFCCC · source ·
- Climate outcome
- Emission reductions
- Activity
- Electricity
- Official page
- cdm.unfccc.int ·
How methodology v3 reads projects of this type
What CarbonMeld reads
- shown
A confirmed investment analysis A-INVEST
The documents show a project-level additionality test, the validation confirmed it, and it is an investment analysis (a numeric test of the project's finances with and without carbon revenue).
Set by the methodology or the programme, not assessed by our current method
- not assessed
Social safeguards and consent of communities (FPIC): any such rules come from the programme, not the methodology. Our current method does not assess it. CM-F-AM0062-SAFEGUARDS-FPIC
Not applicable to this type — never a gap in our current method
The criterion does not apply to this methodology. Our current method never counts it as a gap.
- CM-N-LEAKAGELeakage
- CM-N-BUFFERBuffer pool
- CM-N-PERMANENCE-REVERSALPermanence and reversals
- CM-N-FNRBFraction of non-renewable biomass (fNRB)
- CM-N-USAGEUsage rate of the devices
- CM-N-REGULATORY-SURPLUSNo legal requirement for the activity
- CM-N-DURABILITY-MEASUREMENTDurability of the storage
- CM-N-FEEDSTOCK-SUSTAINABILITYSustainability of the feedstock
- CM-N-END-USE-TRACKINGTracking of the end use
The general rules apply as well. Read the general rules.
The rules of methodology v2.2, as they were: the archived v2.2 page.
History and transitions
-
v02adopted 30 Jul 2010source
Correct Equation 7; Add reference to the "Tool to determine the baseline efficiency of thermal or electric energy generation systems"; Removal of Annex 1.
-
v1.1adopted 12 Jun 2008source
Editorial changes reflected based on request for clarification: 1. Project boundary diagram modified to reflect editorial changes; 2. Figure-2 modified to reflect editorial changes; 3. Equation 4 heading: ELMAX changed to EGMAX; 4. …
-
v01adopted 30 Nov 2007source
Initial adoption.
Projects using AM0062
Browse 5 published projects using AM0062, listed alphabetically. There is no ranking for this methodology yet: it appears here automatically once 5 of its projects not in the pipeline or under validation are rated. Open a project to view its registry details and the analysis available for that project.
Which registries list projects under AM0062?
In CarbonMeld's data, AM0062 projects are on one registry: CDM (5 projects, 2 registered).
| Registry | Projects | Registered | Projects list |
|---|---|---|---|
| CDM (UNFCCC) | 5 | 2 | See the list |
Counts of project records in CarbonMeld's data, with or without a CarbonMeld analysis. «Registered» counts the records whose current registry status is «registered», as last read (15 November 2026); projects in a later status, such as awaiting verification approval, late to verify or completed, are not in that column.
- Analysis: No rating yet
- Analysis: Re-assessment pending
- Analysis: Not registered
- Analysis: No rating yet
- Analysis: Not registered