Skip to main content
CarbonMeld CarbonMeld Carbon Observatory

VMR0006 — Energy Efficiency and Fuel Switch Measures in Thermal Applications

About this methodology

Projects improve cookstoves, ovens or dryers to use less non-renewable biomass, or switch from fossil fuels to renewable biomass. The method measures the resulting emission reductions.

Last published version
1.2 · source ·
Status
Inactive at Verra / Verified Carbon Standard · source ·
Climate outcome
Emission reductions
Activity
Cooking and heat
Official page
verra.org ·

How methodology v3 reads projects of this type

What CarbonMeld reads

  • shown

    Fraction of non-renewable biomass (fNRB): the methodology sets rules for it (VMR0006 v1.1 applicability, p. 4). CarbonMeld reads it in the project's documents. CM-F-VMR0006-FNRB

    Link
  • A confirmed investment analysis A-INVEST

    The documents show a project-level additionality test, the validation confirmed it, and it is an investment analysis (a numeric test of the project's finances with and without carbon revenue).

  • No usage monitoring (cookstoves, biogas, water treatment) Q-NO-USAGE-MONITORING

    Cookstoves, biogas and water treatment: the monitoring or verification reports that CarbonMeld read give no usage rate. For biogas and water treatment, the rule applies where the methodology asks for a usage survey or an operation survey. Where CarbonMeld read no monitoring or verification report, the rule does not apply. A usage check by the verifier counts as usage monitoring. Operation logs and the share of units still in operation count too. CarbonMeld applies this rule only where a check of the documents has confirmed its condition; without that check, the rule takes no points.

Figures set against the methodology's own values

  • fNRB above the official value, or an older default Q-FNRB-ABOVE

    CarbonMeld compares the fraction of non-renewable biomass (fNRB) with the official national value of the country. The rule applies to any project whose documents give an fNRB that CarbonMeld can compare with the official value. A project gets one fNRB deduction at most. Three sources of values get no deduction: TOOL33 version 03.0, A6.4-AMT-009, and a MoFuSS assessment whose stated year is 2024 or later.

    Above the official national value plus its 30% uncertainty.

Deductions that can apply

  • fNRB above the official value, or an older default Q-FNRB-OLD-DEFAULT

    CarbonMeld compares the fraction of non-renewable biomass (fNRB) with the official national value of the country. The rule applies to any project whose documents give an fNRB that CarbonMeld can compare with the official value. A project gets one fNRB deduction at most. Three sources of values get no deduction: TOOL33 version 03.0, A6.4-AMT-009, and a MoFuSS assessment whose stated year is 2024 or later.

    An older default value. This includes the TOOL33 values before version 03.0, the older national defaults and MoFuSS values whose stated year is before 2024. It also includes any other value that the documents give as a default. The CDM's fixed default of 0.3 is the exception. Only the two «above» cases can apply to it.

Set by the methodology or the programme, not assessed by our current method

  • not assessed

    Leakage: the methodology sets rules for it (VMR0006 v1.1, p. 9). Our current method does not assess it. CM-F-VMR0006-LEAKAGE

    Link
  • not assessed

    Social safeguards and consent of communities (FPIC): any such rules come from the programme, not the methodology. Our current method does not assess it. CM-F-VMR0006-SAFEGUARDS-FPIC

    Link

Not applicable to this type — never a gap in our current method

The criterion does not apply to this methodology. Our current method never counts it as a gap.

The general rules apply as well. Read the general rules.

The rules of methodology v2.2, as they were: the archived v2.2 page.

History and transitions

  • v1.2active from 6 Jul 2023 – 9 Oct 2024last publishedsource

    Corrections to align with most recent versions of CDM methodology AMS-II.G ., CDM TOOL30 and CDM TOOL33 . Alignment with AMS-II.G. to allow the application of different monitoring options. Inclusion of applicability conditions, monitoring …

  • v1.1active from 22 Jul 2021 – 27 Mar 2023source

    Includes clarifications and general improvements.

  • v1.0active from 8 Sept 2020 – 21 Jul 2021source

    Expands the methodology’s scope to activities that switch from fossil fuel to renewable biomass. Includes requirement that project stoves must have a thermal energy efficiency of at least 25%. Includes an activity method for additionality …

Projects using VMR0006

Browse 209 published projects using VMR0006, listed alphabetically. There is no ranking for this methodology yet: it appears here automatically once 5 of its projects not in the pipeline or under validation are rated. Open a project to view its registry details and the analysis available for that project.

Which registries list projects under VMR0006?

In CarbonMeld's data, VMR0006 projects are on one registry: Verra (209 projects, 105 registered).

RegistryProjectsRegisteredProjects list
Verra (VCS)209105See the list

Counts of project records in CarbonMeld's data, with or without a CarbonMeld analysis. «Registered» counts the records whose current registry status is «registered», as last read (25 November 2026); projects in a later status, such as awaiting verification approval, late to verify or completed, are not in that column.

51 of these projects have no number: additionality, quantification or both have no public grade of their type of project that applies to them yet. Their pages give the reason and how many negative facts were found; the analysis is in Premium.

← All leaderboards · Full database