Installation of high efficiency wood burning cookstoves in Cambodia
#66of 150 in Cookstoves#10of 18 in Cambodia#717of 1339 in Verra (VCS)#48of 103 in VMR0006
Audit Analysis
A newly registered VCS cookstove project in Cambodia with a verified combined additionality test and a quantified 5% leakage deduction, but lacking a buffer pool, relying on a project-specific baseline, and carrying 15 unresolved-at-validation corrective actions that signal initial documentation gaps. No monitoring data exists yet, which is expected given the April 2024 registration, but it means all claims remain unverified against actual performance.
Red Flags
- 15 material findings and corrective actions (7 CLs + 8 CARs) in the validation report indicate substantial PDD deficiencies at the time of validation, including missing additionality steps, undefined geographical boundaries, and unsupported dropout-rate assumptions
- Baseline method is project-specific with no reassessment date recorded, reducing robustness compared to a jurisdictional or standardised baseline
- The PDD and validation report disagree on both the additionality test type (activity vs. combined) and the crediting period start date, suggesting the PDD was not fully updated before validation
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
Combined test verified by VVB
cookstove dropout risk partially addr
5% quantified deduction with justification
Project-specific baseline; no reassessment date recorded
Grievance mechanism and benefit sharing present; FPIC not do
CORSIA and CCP status not stated in available documents
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →