Skip to main content
VCSEnergy demandLao Registry: RegisteredVMR0006

Installation of high efficiency wood burning cookstoves in Laos – Project 2

VCS-4314 ↗

#50of 150 in Cookstoves#5of 10 in Lao#535of 1339 in Verra (VCS)#39of 103 in VMR0006

5.3/ 10
Integrity
6.2
Transparency
4.8
Claim Safety
4.8
Documentation
5.0

Audit Analysis

A VCS-registered cookstove project in Laos with a solid additionality assessment and quantified 5% leakage deduction, but significant gaps in permanence safeguards (no buffer pool stated), absence of any verified monitoring data, and a project-specific baseline that limits confidence in the 12.2 MtCO2e lifetime claim. The validation report carries 15 corrective actions and a crediting-period discrepancy with the PDD, indicating the documentation was still being refined at the time of registration.

Red Flags

  • No monitoring report or verified ERR figure is available; the 12.2 MtCO2e lifetime claim remains entirely unvalidated against actual performance
  • 15 corrective actions were required at validation, including missing evidence for the 5% drop-out rate and parameter sources, suggesting the PDD was not fully substantiated at registration
  • Crediting period differs between the PDD (2023-06-01 to 2033-05-31) and the validation report (2024-02-17 to 2034-02-16), creating ambiguity about the actual project duration

Credit Vintages

No issuances recorded on the registry.

Risk Indicators

Additionality

VVB-confirmed combined test

Permanence

drop-out evidence pending

Leakage

5% quantified deduction with justification

Baseline

Project-specific baseline, reassessed 2021

Safeguards

FPIC, grievance mechanism, and benefit sharing documented

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-26VMR0006

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents