VCS Energy demand India Registry: Registered Documentazione completa General Methodology v2.0

SMG - Cookstove Program 20

VCS-4661 ↗

5.1 / 10
Integrity
4.2
Transparency
6.0
Claim Safety
4.5
Documentation
6.5

Score Breakdown

Integrity

verified additionality confirmed by the VVB in the validation report (validation report)

missing no buffer pool percentage stated and baseline reassessment not found (monitoring report, PDD not found for reassessment)

Transparency

verified named VVB (LGAI Technological Center, S.A.) and recent monitoring period provided (monitoring report 2024-09-17)

inferred ✗ total emissions claimed not present while total verified emissions are reported (total verified: 61,146; total claimed not found)

Claim Safety

missing project uses a project-specific baseline (VMR0006, methodology 1.2), increasing over-crediting risk

inferred ✗ leakage treatment contradicted across documents (monitoring report vs validation report), reducing claim reliability

Documentation

verified multiple evidence documents and recent monitoring and validation dates (monitoring report 2024-09-17; validation report 2024-10-25; n_docs_used: 10)

inferred ✗ several important fields not stated in extracted record (leakage deduction %, buffer %, usage monitoring method)

Detailed Analysis

Integrity

Additionality was confirmed by the independent verifier (validation report), and the project applied an activity-based additionality test (validation report). However, the baseline is project-specific under VMR0006 (methodology 1.2) and there is no record of a baseline reassessment, no buffer pool percentage, and no stated reversal events; these omissions weaken permanence and baseline robustness. The contradiction over leakage (see overall) further reduces confidence in leakage treatment and implies some reliability issues with reported mitigation of leakage.

Transparency

Transparency is moderate: the VVB is named (LGAI Technological Center, S.A.), the monitoring period is provided (2023-01-01 — 2023-09-30) and the monitoring report (2024-09-17) reports total verified emissions (61,146). Multiple supporting documents are listed and extraction confidence is high. Gaps include absence of total emissions claimed, missing usage monitoring method, grid emission factor, and other quantitative inputs.

Claim Safety

Claim safety is weakened by the project-specific baseline (VMR0006) and missing data that increase over-crediting risk. The financial non-renewable biomass factor is provided (0.8628) but the method used to set it is not stated in the extracted record. The leakage claim is inconsistent between the monitoring report (quantified justification) and the validation report (not addressed), which raises risk that credits could be overstated.

Documentation

Documentation is fair: the monitoring report (2024-09-17) and a later validation report (2024-10-25) are present, n_docs_used = 10, and extraction confidence is high. The VVB appears independent. Nevertheless, several required quantitative fields are missing from the extracted record (leakage deduction percent, buffer percent, usage monitoring details), reducing completeness.

Overall

I privileged the validation report (dated 2024-10-25) over the monitoring report (2024-09-17) on the contradiction about leakage because validation is the higher-priority assessment and is more recent; the validation report states leakage was not addressed while the earlier monitoring report states a quantified justification. Because the validation indicates leakage was not addressed, I downgraded leakage treatment confidence and reduced integrity and claim_safety scores. Overall the project scores moderately (5.1) due to confirmed additionality and good documentation of verification, but missing quantitative safeguards (buffer, leakage deduction) and contradictory leakage reporting materially lower confidence and raise over-crediting/permanence concerns.

Audit Analysis

The project shows some positive elements (additionality confirmed by the VVB, named verifier, recent monitoring) but key gaps and a document contradiction on leakage reduce confidence. Project-specific baseline and missing leakage deduction / buffer information raise over-crediting and permanence concerns.

Project Description

Proponent: Shri Maa Marketing Private Limited Protocol categories: Energy demand Protocols: VMR0006 Estimated annual GHG reductions: 53826 tCO2e Region: Asia Registration date: 2024-11-07

Red Flags

  • Contradiction: monitoring report claims quantified leakage justification, while validation report states leakage was not addressed.
  • No leakage deduction percentage or buffer pool percentage found in available documents.
  • Baseline reassessment date not found; project-specific baseline only, increasing over-crediting risk.

Credit Vintages

Nessuna emissione registrata sul registro.

Cosa migliorerebbe questo punteggio

  • Provide a clear leakage deduction percentage or a reconciled explanation addressing the validation report's finding.
  • Publish buffer pool percentage and baseline reassessment documentation (or update baseline to a recent jurisdictional/standardised baseline).

Questi suggerimenti indicano quali prove pubbliche aggiuntive potrebbero migliorare il livello di confidenza di questa valutazione. Non garantiscono un punteggio futuro più alto.

Risk Indicators

Additionality

VVB-confirmed

Permanence

buffer unknown

Leakage

contradictory treatment

Baseline

project-specific baseline

Safeguards

FPIC and grievance present

Double-claim

CORSIA/CCP status unknown

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis Provenance Scored 2026-04-23 General Methodology v2.0 Documentazione completa

Sei il proprietario di questo progetto?

Correzione metadati (gratuita)

Nome, paese, marketplace o link errati? Segnalacelo.

Non modifica lo score.

[email protected]

Rivalutazione con nuovi documenti

Hai documentazione aggiornata non ancora inclusa? Puoi richiedere un nuovo run della pipeline con i nuovi input.

Invia Documenti