Holistic development of North East India through clean energy access

VCS-3162 ↗

5.7 / 10
Integrity
6.2
Transparency
4.8
Claim Safety
5.3
Documentation
6.4

Score Breakdown

Integrity

verified The validation report (2024) confirms additionality using an investment test and reports no material findings or corrective actions.

missing Baseline is project-specific and the timing of any baseline reassessment is not stated in available documents.

Transparency

verified The VVB is identified (KBS Certification Services Ltd) in the validation report (2024).

missing Core MRV fields (monitoring period, verified ERs, usage monitoring method) are not found in the extracted record.

Claim Safety

verified A specific fNRB value is provided (0.8748), supporting quantification of biomass-related impacts.

missing CORSIA and CCP status are not stated in available documents, and key inputs that drive ERs (usage/monitoring and leakage deduction) are missing from the extracted record.

Documentation

verified Multiple document types are referenced (PDD and validation report) with a recent validation report dated 2024-04-11.

missing Medium extraction confidence and an internal inconsistency on crediting period reduce reliability.

Detailed Analysis

Integrity

The validation report (2024) confirms additionality via an investment test and indicates no material findings and no corrective actions required, which supports baseline/additionality robustness. The baseline approach is project-specific, and the date of any baseline reassessment is not stated in available documents, which weakens confidence in baseline validity over time. Leakage is described as “quantified,” but the actual leakage deduction is not found in the extracted record, leaving uncertainty about whether leakage was conservatively treated.

Transparency

Transparency is constrained because the extracted record does not include a monitoring period, claimed or verified emission reductions, or the usage monitoring method—key elements for assessing MRV quality in an energy demand project. On the positive side, the validation report (2024) clearly identifies the VVB (KBS Certification Services Ltd). Overall, the available extracted fields do not allow cross-checking of ER calculations against monitored usage and reported issuance outcomes.

Claim Safety

Claims risk is moderate because several over-crediting-sensitive inputs are missing from the extracted record, including usage monitoring method, verified usage rate, and any leakage deduction percentage. The project reports an fNRB value of 0.8748, but the method used to derive fNRB is not stated in available documents, limiting confidence in its appropriateness. CORSIA eligibility and CCP status are not stated in available documents, increasing uncertainty for downstream claims and labeling.

Documentation

Documentation is reasonably strong in that the extracted record references a recent validation report (dated 2024-04-11) and also includes a PDD, with 8 documents used overall. However, the minimum extraction confidence is only medium, suggesting some key details may not have been reliably captured. The presence of a contradiction on the crediting period also indicates document version control issues that reduce confidence in the record’s completeness and consistency.

Overall

Overall scoring is pulled down mainly by MRV and quantification gaps (monitoring period, usage monitoring, verified ERs, and leakage deduction not found in the extracted record), which are central to credit quality for energy access projects. The key contradiction is the crediting period: the validation report (2024) states 2023-06-01 to 2033-05-31, while the PDD (2022) states 2022-07-01 to 2032-06-30; the validation report value is privileged because it is more recent and reflects the VVB-reviewed project configuration, but the inconsistency still reduces reliability and thus lowers transparency/documentation scores. Gate rules note: documentation is above 3.0 and integrity is above 4.0, so no deterministic caps would be triggered post-scoring.

Audit Analysis

The project shows some core integrity strengths, notably VVB-confirmed additionality via an investment test and no reported material findings or corrective actions in the validation report (2024). However, key MRV and baseline/leakage quantification details are missing from the extracted record (e.g., monitoring period, usage monitoring, leakage deduction), which increases over-crediting and claims risk.

Project Description

Proponent: SDG 13 Ventures Pte. Ltd. Protocol categories: Energy demand Protocols: VMR0006 Estimated annual GHG reductions: 790204 tCO2e Region: Asia Registration date: 2024-06-18

Red Flags

  • Crediting period dates conflict between the PDD (2022) and the validation report (2024), indicating document control/versioning risk.
  • Monitoring and usage monitoring details are not found in the extracted record, which is material for an energy access/demand project’s ER calculation credibility.
  • Leakage is described as “quantified” but the actual leakage deduction percentage is not found in the extracted record.

Credit Vintages

Nessuna emissione registrata sul registro.

Cosa migliorerebbe questo punteggio

  • Publish/confirm the monitoring plan and results: monitoring period, usage monitoring method, verified usage rate, and claimed vs verified ER totals in the monitoring/verification reports.
  • Resolve document control issues by issuing a consolidated project description that reconciles the crediting period dates across the PDD and validation report, with registry updates reflecting the final dates.
  • Disclose leakage treatment quantitatively (leakage deduction percentage and calculation) and provide the fNRB derivation method/source used for the 0.8748 value.

Questi suggerimenti indicano quali prove pubbliche aggiuntive potrebbero migliorare il livello di confidenza di questa valutazione. Non garantiscono un punteggio futuro più alto.

Risk Indicators

Additionality

VVB-confirmed investment test

Permanence

Reversal/buffer not applicable or not evidenced

Leakage

Quantified leakage claimed, deduction not evidenced

Baseline

Project-specific baseline; reassessment timing unclear

Safeguards

FPIC and grievance mechanism documented

Double-claim

CORSIA/CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis Provenance Scored 2026-04-07 General Methodology v2.0 Documentazione completa

Sei il proprietario di questo progetto?

Correzione metadati (gratuita)

Nome, paese, marketplace o link errati? Segnalacelo.

Non modifica lo score.

[email protected]

Rivalutazione con nuovi documenti

Hai documentazione aggiornata non ancora inclusa? Puoi richiedere un nuovo run della pipeline con i nuovi input.

Invia Documenti